HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 5, 2025, 5:12 AM
gecho111 gecho111 is online now
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 910
Second bridge span demolition started tonight. https://imgur.com/a/north-albert-street-bridge-demo-phase-1-OIT5VnC


From the controller the video looked dark so I stopped recording. But what I did record was ok. Trickier spotting hazards flying at night. I knew there was a set of power lines around there I needed to avoid.
https://www.youtube.com/watch?v=dEqwft_Rg4Q

They were busy during the night. Downloading 25GB of video from the drone which will take a while to edit, render and upload to youtube.


Videos from this morning.

Timelapse
https://www.youtube.com/watch?v=87fyAVODkkA

Overhead timelapse
https://youtu.be/r9qkUIu9lik

Site orbit:
https://youtu.be/wyBwqw6FBCE

Last edited by gecho111; Apr 5, 2025 at 6:51 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:38 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.