The second phase is then proposed to include a 45-storey tower (G3) with 415 strata units and a six-storey building (G4) with 70 non-market rental units again provided at rates that are 20% below CMHC medians. At this time, a site-specific development application for Phase Two has not been submitted, according to the City, so the unit count and suite mix are not finalized.
City staff note that Phase Two will also include "an optional commercial opportunity, that may be pursued or converted to a residential amenity at the time of a future site-specific development application (PPA or DP)." They also say that the timing of Phase Two "may be impacted by market conditions" and that the Phase Two site will be permitted for use as a temporary sales centre until the redevelopment is ready to commence.
When that time comes, LedMac "may choose to refine the design of the proposal insofar that it continues to meet the Southgate Master Plan and that refinements do not result in an increase in the proposed maximum building height or the maximum density identified for the Phase 2 site within the plan of development."