HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #25  
Old Posted Mar 10, 2025, 2:01 AM
ItsCalledTownLake ItsCalledTownLake is offline
Registered User
 
Join Date: Aug 2022
Posts: 2
Quote:
Originally Posted by gillynova View Post
Not an expert but I feel like the electric box in the back might be a problem for them to build. Might be powering most of 6th (shrug)

Correct. It's an AE vault that powers a large portion of the southside of 6th Street. When markets were favorable to build, AE took over 18 months (and still ticking) to work on a redesign for an alternative below-grade vault and conduit. This caused severe delays for the developer.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 5:05 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.