Yeah, it's been been a few days, maybe a week? I think the construction fencing being removed from the roadway is new today, I'm guessing we'll likely see all lanes in service soon.
More details:
https://globalnews.ca/news/11052557/vancouver-broken-sewer-main-update/
Expensive, still don't know what's going on, won't be permanently fixed until the Fall (if then).
On the bright side imagine all the other sewage pipes failing in that area![]()
Main Street overpass in North Vancouver struck by vehicle: ministry
The Ministry of Transportation and Transit says the Main Street overpass in North Vancouver was struck during an incident Friday morning.
1130 NewsRadio received calls about a truck possibly hitting the overpass just after 9 a.m. The MoTT explains its maintenance contractor and bridge crews are assessing the location, just north of the Ironworkers Memorial Second Narrows Bridge for damage.
“There is no impact to traffic,” the ministry said in a statement to 1130 NewsRadio.
“[Commercial Vehicle Safety and Enforcement] CVSE is aware and is investigating the incident,” the ministry added.
The BC Highway Patrol confirmed Friday afternoon that it is investigating the strike after it was first reported to police around 9:30 a.m.
“Officers attended the scene learned that a grader being transported on a flat deck tractor trailer had struck the Main Street overpass. Upon inspection minor superficial damage to the overpass was observed as well as damage to the cab of the grader,” said BCHP.
Mounties say the driver was stopped on the shoulder of the road south of the Main Street on ramp when officers arrived.
In September 2023, the same overpass was struck by a commercial vehicle, leaving behind damage and tying up traffic for hours.
This memo responds to a November 2023 Council motion on enhancing the road paint maintenance program to improve transportation safety, describing the current approach, challenges, and what an optimized program could look like.
The current program budget ($0.7M in 2024) is not sufficient for regular maintenance of all road marking in the city, and priority is given to the most essential markings (centre and lane lines).
• Maintaining all road markings (including crosswalks and stop bars) would require the budget to increase to about $1.6M.
Changes to the to the road marking maintenance program budget can be considered as part of the annual operating budget process.
The current program typically allows for reactive maintenance of about 2 to 3% of the city’s 1,354 crosswalks to be refreshed each year. However, in the most recent annual assessment, 18% were rated in ‘poor’ condition, with another 65% in ‘fair’ condition; only 17% were rated in ‘good’ condition
Well, this is weird because one sewer notably failed to the east of Olympic Village. Spilled shit (literal) on the street and stunk it up. They did an emergency repair and re-paved the road, etc all within a few weeks.
Then they did some "exploratory" work around Terminal and found this problem and it's been a shit-show since. That was June 2024. So... what is the difference? If you don't know what the long term problem is, do whatever you did with the first leak and analyze the pipes and stuff separately.
:shrug:
there is definitely something bigger at play....cant be a coincidence
In June 2024, the Columbia Street Sewer underwent emergency repair work due to a sewer leak. Metro Vancouver is now planning urgent work to rehabilitate a 1.7 kilometer section of pipe to extend its service life and ensure continued protection of public health and the environment.
Work is anticipated to begin in early 2025 and continue into late 2025. Construction will take place at multiple locations along the sewer, starting at Terminal Avenue and Quebec Street, and ending at Yukon Street and West 8th Avenue.
https://metrovancouver.org/services/liquid-waste/columbia-street-sewer-repair
He said the burst Terminal Avenue pipe — known in sewer engineering parlance as a "force main" — is identical to the one that broke in Olympic Village last June, flooding the neighbourhood with raw sewage.
Force main pipes are specially designed to pump sewage uphill.
Crews are still trying to determine why the Terminal Avenue pipe burst. As for whether 100-year pipes come with a warranty, LaClaire isn't sure.
"That's a good question," he said.
"There's a very small segment of our sewer system that involves force mains and an even smaller set which has this type [of pipe]. But we are very much looking at other locations to know if what happened here could happen again under similar conditions."
Thanks.
We all can observe that maintenance of road markings has been really poor in the past, so this is good.
New protected bike lanes along West 1st Avenue (Pine Street to Burrard Street) and Fir Street (West 1st Avenue to West 2nd Avenue)
Upgraded protected bike lanes along West 1st Avenue (Pine Street to Creekside Drive) and Burrard Street (York Avenue to West 1st Avenue)
Wider sidewalks along West 1st Avenue and Fir Street
New protected intersections at Burrard Street and West 1st Avenue and Fir Street and West 1st Avenue (Squamish Nation-delivered)
New traffic signals at Fir Street and West 1st Avenue and Fir Street and West 2nd Avenue
New Squamish Nation-delivered plaza at West 1st Avenue and Fir Street
Parking changes in select locations
Commercial vehicle hits overpass in Delta
Cpl. Michael McLaughlin, media relations officer for BC Highway Patrol said the strike was reported 7:32 a.m., on Highway 99 northbound at the 112 Street overpass in Delta. The vehicle involved was a commercial garbage truck. The truck did not stop at the scene.