I wonder if they'll reconfigure lanes at the approach at all. I also wonder how they're going to police big trucks now.
The Bridge Commission is wasting no time:
![]()
I am very disappointed that they will not be saving the original toll booths from the Macdonald, as they are one of the few examples of East German/Soviet Bloc architecture to be found in North America. Such a loss.
I am very disappointed that they will not be saving the original toll booths from the Macdonald, as they are one of the few examples of East German/Soviet Bloc architecture to be found in North America. Such a loss.
For the record, your chance to acquire a Soviet-style toll booth for an in-law suite is long past. The original painted steel booths were replaced some years ago -- I want to say at the time of the Big Lift in 2015-2016 but it may have been earlier, around the time of the 1999 refit -- by the current prefab stainless steel models.
HHB has posted the new configuration for the Macdonald approaches. The plan for the McKay is still to come.
![]()
Source: Halifax Harbour Bridges
They'll need to get the signal timing at the intersection just right or this will be a big mess. I don't like how the 2 left from Wyse lanes + diamond lane just sort of squeeze into 2 or often one with the reversing bridge lane. The tolls and funnel merge naturally govern this now.
The right turn from Wyse will need it's own dedicated time, can't remember if that's the case now or if it combines with straight from Nantucket. That would be messy if it does.
For the record, your chance to acquire a Soviet-style toll booth for an in-law suite is long past. The original painted steel booths were replaced some years ago -- I want to say at the time of the Big Lift in 2015-2016 but it may have been earlier, around the time of the 1999 refit -- by the current prefab stainless steel models.
.
- The BRIDGE (EB) left onto Wyse is not designed well. There is no storage lane and the left-turn light is significantly shorter than the straight-thru. The vehicles wanting to turn left will clog up traffic wanting to continue straight onto Nantucket. I use this left-turn daily and there is always a queue even in off-peak times. This is because for traffic heading north towards Burnside it is quicker, smoother, and less traffic lights to use Wyse Road than Victoria Road. Part of the inefficiency of Nantucket is caused by the stupid traffic lights which prioritize shortcutting traffic using School Street over the very busy Nantucket to Victoria NB movement.
The bridge commission has released the revamped McKay lane plans. Looks much better than the MacDonald. It essentially just keeps the two lane Circ. (West of Victoria Road) straight onto the bridge.
I had a thought while crossing the Macdonald the other day. I will defer to others as to whether this would be worth pursuing.
I understand that the MacKay was rather lightly-constructed and that is a big reason why it needs replacement soon. It just cannot take the wear and tear and is falling apart, a disquieting thought.
However I understand that the Macdonald, being a 1950s design, is built much more robustly and that is what allowed it to handle the addition of a third lane and the bike and pedestrian decks cantivered over the edges. Just looking at the structure it certainly seems more heavily-built. I was crossing it the other day and noticed two things. The temporary structure constructed on the Dartmouth tower for whatever it is they are doing to it was fully in place, and also at some point I noticed that the overhead sign structures above the roadway appeared to have been replaced with new ones, which I seem to have missed. They looked different to me though so I assume that was done.
Looking at the level where both of those things were affixed, it occurred to me that there seemed to be plenty of room for another deck overhead to fit within the existing tower structures. Many other bridges have done this, like the GWB in NYC, to handle growth. Here, the existing towers might not be able to handle more than 2 additional lanes overhead, I'm unsure, and it may be that the existing deck level might need to lose part of 1 lane to handle whatever supports an upper deck may require, but you are still getting additional capacity. If one lane of the existing deck needs to be sacrificed that might still leave enough for a pedestrian path and the existing poorly-used cycling lane.
I do not know if any studies or analysis on this were ever done but it would be nice to explore the idea. Reconfiguring the exits and intersections at either end would of course be necessary but that has been needed for a long time in any event. That would also bury the silly bike lane flyover proposal on the Halifax side as the upper deck would need to deal with vehicle traffic in a similar way itself, so fold the bikers into that. Logically it seems to my layman self that Halifax-bound traffic would be the logical candidate for an upper level to eliminate the at-grade intersection in Dartmouth coming down Nantucket which has been recently bottlenecked further by Sam Austin's traffic signal and intersection changes to delay that flow significantly, and provide a way to reduce the grade when landing on the Halifax side.
I am no engineer so I do not know if a lane on the existing deck would need to be narrower or not. Nor do I know if the theoretical upper deck could handle more than 2 lanes. All that would need figuring out.
It is disappointing to have ideas I have never heard discussed before dismissed out of hand. The Halifax way, I suppose
This is an intriguing idea.
Without having taken the time to think it through more clearly, I’m thinking that without a plan in place to deal with the bottlenecks in the vicinity of the approaches, it could just turn out to be an exercise in finding the next weak link in traffic flow.
One thought I had is that maybe a second deck could be used as a dedicated BRT/LRT route, but that would also require additional planning, which seems to be a weak point for council these days. They seem to get through the “active transportation” part of it and then run out of steam.
One unknown to me is how you would hang the extra deck from the existing towers. As a suspension bridge, there would need to be a second set of cables from which to hang the new deck, and I imagine that they would have to be stepped inward to avoid interference with the existing set. This would change the loading significantly, so an extensive engineering study would have to be done before it was even considered as a possibility (and maybe one was done?).
Just musing a little. I like the outside-of-the-box thinking. I wish the people in power did more of this.