St. Paul's Hospital & Health Campus | U/C


Isn’t it time to get rid of the wasteful low rise single family homes north of this huge employment centre? The whole area should be zoned for towers to help ensure the hundreds working there have access to housing near their employer.

Naw focus on your west side neighbourhood first. :D
 
Naw focus on your west side neighbourhood first. :D

Strathcona is pretty much downtown adjacent, should have been developed a long time ago. Imagine if Project 200 had gone ahead, there would have been a high density neighbourhood similar to the West End in place decades ago.
 
Strathcona is pretty much downtown adjacent, should have been developed a long time ago. Imagine if Project 200 had gone ahead, there would have been a high density neighbourhood similar to the West End in place decades ago.

reminds me of this 1957 plan for strathcona.

 
There's a lot of heritage in Strathcona but there's also a lot of more newer infill/Vancouver Specials etc. I mean the existing public housing coops would probably be the best sites and they are closest to transit. You also have the No 1 firehall possibly leaving and the huge community garden if you really wanted to build hospital focused housing.
 
Where did you hear about this? Wasn't the whole point of the temporary fire hall that the halls in the area were under strain, why would No 1 hall be leaving?

There was a report earlier this year to Council that identified problems with the existing headquarters, that are part of Firehall #1. The location is compromised by the rail tracks (as the Prior Street underpass is on indefinite hiatus) and the current building is not to seismic code any more - far from ideal for a firehall. However, there's no plan to relocate the building yet, or any financing in the current capital budget.

If/when a replacement location is confirmed, it would almost certainly be larger. The temporary firehall that was proposed for Gore is exactly that, urgently needed, and temporary. If/when Firehall #1 was relocated, it should be big enough to replace the existing hall, and any interim temporary hall.
 
Soil remediation

Details



Primary Location: 1002 STATION STREET, Vancouver, BC V6A 0J7


Specific Location: 1002 Station St - Clinical Support & Research Centre (CSRC)

Note:
Street/Road name proposal is pending for the private road fronting the primary entry to the hospital. At later stages the name of the new road will supersede "Station St."


Work Description: Building Permit for BP-2024-02166

Soil remediation of the existing contaminated site as part of the construction of the new St. Paul's hospital complex. Site preparation including removal of approx. 9,500m3 of soils from the project site to designated facilities, temporary drainage installations, temporary guide wall and lock-block installations in preparation of shoring wall installations.

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=248876527
 
End of year update:
Huge progress was made in 2024 to bring our new hospital and campus closer to reality. 2025 is shaping up to be another jam-packed year. Here's what you can expect:

New St. Paul's Hospital
Now that we've built the hospital's 11-storey structure, work on the interior and exterior continues.

Exterior completes: Terracotta panelling, windows, wooden entrance canopies, etc. will be installed.
Interior work: Wiring, painting, wall protection installation continues. Large, integrated equipment and furniture will also start to be installed.
Landscaping: Work on the Wellness Walk, Traditional Medicine Garden, and other green spaces will begin.
Full-scale mock-ups: Select rooms will be built inside the new hospital. These rooms will have real walls, flooring and fixtures so teams can do a final check before the rest of the rooms are constructed.


Clinical Support & Research Centre (CSRC)
The state-of-the-art hub for innovation and research is greeting the new year with an exciting milestone – construction kick-off! This is thanks to the incredible work done in 2024 where we rapidly advanced through building design, including modern workspaces, research labs, the Innovation Centre, and a childcare facility.

Construction progress: Work on site has begun, with bulk excavation set to begin in July.
Ongoing design and engagement: Design work will continue into the summer.
Permit updates: Providence and the City of Vancouver are continuing to work together to issue the CSRC Development Permit and Building Permit Stage 1 by February 2025.

KfPCoKF.jpg


VDHfoR0.jpg


5ffh90h.png
From New St. Pauls Hospital Project https://mailchi.mp/providencehealth.bc.ca/project-and-construction-update-14196012?e=4a58a40216
 
Development permit and Stage 1 building permit (excavation) has been issued for the CSRC.

From the newsletter

Clinical Support & Research Centre (CSRC)
The state-of-the-art hub for innovation and research is greeting the new year with an exciting milestone – construction kick-off! This is thanks to the incredible work done in 2024 where we rapidly advanced through building design, including modern workspaces, research labs, the Innovation Centre, and a childcare facility.

Construction progress: Work on site has begun, with bulk excavation set to begin in July.
Ongoing design and engagement: Design work will continue into the summer.
Permit updates: Providence and the City of Vancouver are continuing to work together to issue the CSRC Development Permit and Building Permit Stage 1 by February 2025. ‘

https://thenewstpauls.ca/newsletter-looking-ahead-to-2025/
 