SkyTrain Station Renovations

Would you like to separate this thread for individual station projects?

  • Yes

    Votes: 19 31.1%
  • No

    Votes: 42 68.9%

  • Total voters
    61
  • Poll closed .

You should travel out to Surrey then - Scott Road and Gateway stations have covered tracks.

Interesting - both built at about the same time (Surrey Extension era early 1990s).

Maybe King George Station, too?
https://en.wikipedia.org/wiki/King_George_station#/media/File:King_George_Station_platforms.jpg

Surrey Central could be covered, but open on the sides.
https://files.structurae.net/files/photos/2546/t-surreycentral-20241007_094154.jpg

So it could be consistency with that expansion era.

Marine Drive

Ah, yes, that would be fall protection from debris from the condo towers above.
There's also a canopy at New Westminster Station and one behind the Civic Tower in Surrey.
 
Ah, yes, that would be fall protection from debris from the condo towers above.
There's also a canopy at New Westminster Station and one behind the Civic Tower in Surrey.

I looked on google maps and Bridgeport is completely covered as is Templeton and YVR are completely covered and the stations on the Richmond branch are at least all partially covered.
 
even though Capstan is finally opened, the staff have yet to peel off the stickers on the station map signs on the platforms in other stations, nor replace all the signage inside the trains to include the new station.
 
even though Capstan is finally opened, the staff have yet to peel off the stickers on the station map signs on the platforms in other stations, nor replace all the signage inside the trains to include the new station.

Typical Translink. That Tap and Win contest they had a year or so ago, many months after it was over, the promotional decals were still on most of the station faregates.

Ron.
 
Pics by me Sat, January 11th.
I couldn't tell what was going on at platform level, so didn't take any pics.

rgJjhFP.jpeg


tgDuBtA.jpeg
 
Construction hoarding has been removed from the new escalators at Brentwood Town Centre.

Note they were running four car trains today. Normally the two car trains stop farther away from the new escalators.

32q1kWM.jpeg
 
is Surrey Gateway getting a second stairs-only entrance/exit on the South side? they completed the stairs many months ago, but it still sits all fenced off. Will be great if its for public use.
 

Pics:

I recall someone said that an art display will be in the glassed in box (covered by a wrap).
The new escalators are down only to clear the platforms.
Since they are at the far end of the platform, I wonder how many people will use them?
It might make more sense to set them as the up escalators and make people walk the longer distance to go up,
but then everyone is spewed out at the east end of the platform, unless they walk up the stairs.

skytrain-brentwood-town-centre-station-upgrades-march-2025-20.jpg

https://dailyhive.com/vancouver/skytrain-brentwood-town-centre-expansion-upgrade-opens-complete

skytrain-brentwood-town-centre-station-upgrades-march-2025-12.jpg

https://dailyhive.com/vancouver/skytrain-brentwood-town-centre-expansion-upgrade-opens-complete

skytrain-brentwood-town-centre-station-upgrades-march-2025-36.jpg

https://dailyhive.com/vancouver/skytrain-brentwood-town-centre-expansion-upgrade-opens-complete

Artigiano coffee shop at the start of the bridge.

skytrain-brentwood-town-centre-station-upgrades-march-2025-7.jpg

https://dailyhive.com/vancouver/skytrain-brentwood-town-centre-expansion-upgrade-opens-complete
 


Back
Top