NEW YORK | 175 Park Avenue (Grand Hyatt) | 1,581 FT | 92 FLOORS


I hope this gets going shortly, in early 2025.

Trophy office towers along Park Ave. have no availabilities. The rare available space goes for like $300/sf. Landlords are even paying tenants to leave so they can lease bigger spaces at higher rents. I can't imagine they won't have an anchor tenant in 2025.
 
for now i just want the scubby hyatt torn down asap, so i can finally have a reason to go up in one vandy -- to gawk at the temporary full chrysler view. :tup:
 
Last edited:
Don't know where they got that info, but we initially saw the higher figure here...


https://www.wsp.com/en-us/projects/175-park-avenue


175 Park Avenue
Creative structural solutions allow a supertall structure to rise above below-grade transit lines on a tightly constrained site in Manhattan.



Floors 83

Height 1,580 feet




img-175-park-ave-street-presence.png


They've worked on the tower, so would likely know more about it. But at this stage, I wouldn't bank on anything exact until building permits are filed.
 
I am DYING for news about this tower. Blackstone or Morgan Stanley are the two best candidates to anchor this icon in my opinion.

We cannot get this extraordinary icon fast enough.

173361629.2gnkk3f5.r32000b.jpg
 
Last edited:
It could happen if we get lucky but I'm not holding my breath. Same for all other NY supertalls.

There’s a huge demand for space. My only concern about this is that it will take a long time just to raze the hotel. I’d like to see the hotel come down soon so that the site is ready to go once a tenant comes along.
 
It could happen if we get lucky but I'm not holding my breath. Same for all other NY supertalls.

I'd be very surprised if they didn't get an anchor tenant in 2025.

The market for trophy office space in Midtown has likely never been tighter. There's no newer space available.
 
There’s a huge demand for space. My only concern about this is that it will take a long time just to raze the hotel. I’d like to see the hotel come down soon so that the site is ready to go once a tenant comes along.

Demo and construction will begin at the same time.



175127946.fa7e933b.JPEG





175127947.3734958c.JPEG





175127949.7e6d4910.JPEG





175127950.a7450f8b.JPEG
 
RXR is really expecting to get things moving on this tower sometime next year (2025), which is really a matter of months if things go according to plan. Major transit improvements to Grand Central come along with this tower.


DECEMBER 21, 2024



175129064.d3d8bce3.JPEG





175129064.CHrKb0jp.IMG_6273.JPG





175129065.Fqnep2cM.IMG_6274.JPG





175129066.Matoqq3N.IMG_6275.JPG





175129067.3nYMcWE7.IMG_6276.JPG





175129068.UPRiIk6N.IMG_6277.JPG





175129069.778YnjQl.IMG_6278.JPG





175129070.bxrGrxrh.IMG_6279.JPG
 
I've mentioned it before but the straight line "piping" really accentuates the vertically and makes it absolutely soar. The offset piping really takes away from that dynamic IMO, even if the sparser look provides for a simpler more clarified crown.

I also think the "deco-modern-gothic" consistency of the curved and peaked vertical piping is totally contradicted by the current straight diagonal offset transitions at each of the stepped back tower segments. The previous tighter and completely vertical version was so much more graceful because it allowed the eye to follow that line all the way from the base to the gothic cathedral-like crown.
 


Back
Top