General Vancouver Development Updates II


Crane going up for the Tesla service centre on Venables

6urmd3G.jpeg
 
Thanks what about the empty 1275 E 2nd Ave, Vancouver, BC V6A 3T9 site?

Some minor changes in September and they got a new CP in October. Seems like it's proceeding.

In accordance to Section 4.5 of the Zoning and Development By-law, your request is granted as follows:

1. Update floor level count from 5 to 7.
2. Two mezzanine levels counted as individual floors.
3. Addition of Vista Switch room.
4. Revision to parking layout.
5. Cladding revisions, and additional unit entries added to accommodate new demising walls.
6. Loading and parking count changes. And
7. Interior alterations to demise units.


STAGE CONSTRUCTION
Stage 1 - Excavation and Shoring - issued September 13, 2022

Stage 1 Revision 1 - Reduction in extent of cut-off wall following additional ground water seepage analysis on site - issued August 2, 2023

Stage 2 - Full Construction - issued September 8, 2023

Revision 2 - Change of CP from T.McAuley, Architect AIBC to S.Chui, P.Eng. effective October 25, 2024. - in review

They have all the permits to start excavation but obviously they haven't started.

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=147288263
 
692 W 29th Ave - Permits? We don't need no stinking permits


Google Earth


https://plposweb.vancouver.ca/Public/Download.aspx?PosseObjectId=247892231

The brash decision to demolish this single-family home, & start construction of 8 townhomes without securing any permits will see fines levied against the developer of the “Modern on Heather.” Yet, this fiscal cost may pale compared to the reputational damage.

https://bsky.app/profile/city-duo.bsky.social/post/3lcvujkjbcs2d
 
Not sure how they possibly thought this could go well for them. Will likely end up making the project take longer than if they had waited for the permits, too.
 

Not sure where they went wrong with the demolition but they did seem to go through some aspect of the process..

To demolish this single detached house to grade by deconstruction

75% recycling is required

Note:
"Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or 604-873-7000 outside of Vancouver."
The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [email protected]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit.


Type of Work: Demolition / Deconstruction

Oct 17 2024

SA permit has not been issued yet. Please recall when ready

Nov 4 2024

Passed

Nov 12 2024

Inspection | Demo - Demo notification Passed

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=187530962

Dec 6 2024

Enforcement Issues Need Resolution

Oct 31st


Details
Primary Location: 692 W 29TH AVENUE, Vancouver, BC V5Z 2H9
Specific Location:
Work Description: Salvage & Abatement Permit for DB-2022-05232 To demolish this single detached house to grade by deconstruction

75% recycling is required

Ok for SIPs per M. Lee


Note:
"Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or 604-873-7000 outside of Vancouver."
The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [email protected]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit.


Type of Work: Salvage and Abatement

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=187868645
 