VIA Rail


Sounds like a similar play as the Ontario Liberals. Somehow I doubt the outcome will be much different either.

The Ontario Liberal plan was basically a napkin proposal with no homework done at all. This is an actual bid with real bidders being given years worth of engineering data. There's a difference.

Whether it survives politics, hard to say. I'll give you that.
 
The Ontario Liberal plan was basically a napkin proposal with no homework done at all. This is an actual bid with real bidders being given years worth of engineering data. There's a difference.

Whether it survives politics, hard to say. I'll give you that.

The RFP was only due in July. I can’t imagine there is that much engineering detail if these proposals were evaluated in 3 months. The federal government can’t hire a clerk in 3 months.
 
Federal government going ahead with high-speed rail between Quebec City and Toronto

Trains to reach speeds of up to 300 kilometres per hour

https://www.cbc.ca/news/politics/high-speed-rail-canada-1.7365835

I would be happy if VIA could increase the speed limit on the Bathurst sub in northern NB. I think the current top speed allowed for the VIA Ocean on this section of track is 30 km/hr or some such. :rolleyes:

The track bed is in such rough shape that you would risk derailment going any faster.

Such is life in the Maritimes when the decision makers all live in Montreal, Ottawa or Toronto. :hell:
 
The Ontario Liberal plan was basically a napkin proposal with no homework done at all. This is an actual bid with real bidders being given years worth of engineering data. There's a difference.

Whether it survives politics, hard to say. I'll give you that.

I don't think there a difference in the way that it counts. Both are cases of lame-duck Liberal govs pulling out flashy, big ticket projects at the last second to wow voters and distract from their records. And in both cases it comes across as desperate and disingenuous since if they were serious, they could have committed to the projects near the start of their terms and actually made serious, difficult to reverse progress. So they're basically bribes to stay in power, when what's actually needed is accomplishments on their record rather than future promises.
 
Yeah, even though I fully support HSR and Rail travel in general....

In Canada, a HSR announcement has become one of the sure signs of a government about to fall. It feels like when a government is teetering on its last legs, it will make an HSR announcement, hoping it will buy votes and stability, while more likely they'll just fall and the announcement will wither on the vine.

Frankly, I won't believe we'll get HSR until the trains are actually running. And even then I give it even odds the service will be cancelled/downgraded before it can do much.
 
I don't think there a difference in the way that it counts. Both are cases of lame-duck Liberal govs pulling out flashy, big ticket projects at the last second to wow voters and distract from their records. And in both cases it comes across as desperate and disingenuous since if they were serious, they could have committed to the projects near the start of their terms and actually made serious, difficult to reverse progress. So they're basically bribes to stay in power, when what's actually needed is accomplishments on their record rather than future promises.

This is not.a decision out of left field. This project has been moving forward and this is the point in the project where a decision needs to be made.

Let’s see what PP does with it.
 
The RFP was only due in July. I can’t imagine there is that much engineering detail if these proposals were evaluated in 3 months. The federal government can’t hire a clerk in 3 months.

Project office was stood up in 2017 I believe. And they've been funding engineering studies, market and financial models since 2019/2020. This is all days that is GFI that would have been provided. And something no other federal rail proposal actuallt for to, in living memory. That data was shared with the bidders. This bid evaluation is not for construction though. It's for the development phase. That's why bid eval was only three months. It's picking a developer. The actual construction RFP is still years away.
 
I don't think there a difference in the way that it counts. Both are cases of lame-duck Liberal govs pulling out flashy, big ticket projects at the last second to wow voters and distract from their records. And in both cases it comes across as desperate and disingenuous since if they were serious, they could have committed to the projects near the start of their terms and actually made serious, difficult to reverse progress. So they're basically bribes to stay in power, when what's actually needed is accomplishments on their record rather than future promises.

I'm not disagreeing on the political optics. They suck. But the idea that is exactly the same as the napkin proposal the Wynne Liberals put forward is just flat wrong. The Ontario Liberals didn't do anything more than party a company to do a Google Maps survey. And then they hired Collenette to do a bit more when mayors in SWO started calling them out. HFR has, to date, been run closer to any other federal project with actual engineering work done, a proper phased project plan and proper bid process.
 
This is not.a decision out of left field. This project has been moving forward and this is the point in the project where a decision needs to be made.

Let’s see what PP does with it.

It's been moving forward... at a glacial pace that I've been frustrated by for awhile now. The problem I have with it isn't that I think the decision is out of left field. It's that I simply don't find plausible to suggest that each stage couldn't have been done sooner if the government genuinely cared about it. So even though the issue in this case was too much lead up rather than too little, the result ends up being basically the same.
 
I'm not disagreeing on the political optics. They suck. But the idea that is exactly the same as the napkin proposal the Wynne Liberals put forward is just flat wrong. The Ontario Liberals didn't do anything more than party a company to do a Google Maps survey. And then they hired Collenette to do a bit more when mayors in SWO started calling them out. HFR has, to date, been run closer to any other federal project with actual engineering work done, a proper phased project plan and proper bid process.

Yet here we are in the same basic situation where there's a low-polling Liberal government making an HSR announcement that will likely never amount to anything. That's what I meant when I said, "In the way that it counts". If anything, this scenario is worse since it will mean losing a lot more money and feeling like a much bigger loss when it's shelved.

I hate being so negative, but I'm sick of this.
 
Yet here we are in the same basic situation where there's a low-polling Liberal government making an HSR announcement that will likely never amount to anything. That's what I meant when I said, "In the way that it counts". If anything, this scenario is worse since it will mean losing a lot more money and feeling like a much bigger loss when it's shelved.

I hate being so negative, but I'm sick of this.

I'm with you. I detest this government for their incompetence on this file. It was one of the reasons I originally voted for them in 2015.

And it's sad, because this is honestly the most work ever done on the idea. And like you said, this all risks being wasted.
 
Project office was stood up in 2017 I believe. And they've been funding engineering studies, market and financial models since 2019/2020. This is all days that is GFI that would have been provided. And something no other federal rail proposal actuallt for to, in living memory. That data was shared with the bidders. This bid evaluation is not for construction though. It's for the development phase. That's why bid eval was only three months. It's picking a developer. The actual construction RFP is still years away.

The 2017 office was tasked with evaluating the 2015 Via proposal. According to the transport committee it spent 18 million over 4 years on studies, which isn’t nothing, but it is likely very preliminary work. Ontario gave Metrolinx $150M in 2016 to study the Ontario Line, for example. The decision that higher speed options should be considered wasn’t made until 2022 or 2023, so I am not sure what value the Via studies were.

The 2022 project office has been conducting more studies, but they still seem to be very preliminary, like locating the reptiles, for example.

https://hfr-tgf.ca/field-studies/reptiles/

To me if the government was serious about this they would have located the reptiles much earlier.
 
With this talk about HSR Studies, all I can think of is this old Rick Mercer sketch... which is 12 years old now and still as fresh today as it was then. :(

• Video Link


They can make all the announcements they want. But frankly, at this point, until the first train runs with passengers, it's going to be skeptically received.
 
For those who understand French, Radio Canada had an interview with 4 ex-politicians/aides on the viability of HSR and it's probably the best (only?) pov we have of how a Conservative government with the Bloc in opposition/PQ in Quebec government would treat this project and...it doesn't look too promising:

• Video Link


My best attempt at translation:

Dmitri Soudas (ex-Harper aide) at 1:50 "I think the day that we'll see HSR is the day the Conservatives give the CBC [letters spelled out in English] $2 billion a year".

So, yeah, not a good sign.

Jean-Francois Lisee (ex PQ leader) at 4:00 when asked what he thought of the travel times between Toronto and Montreal: "I'd only go to Toronto in my dreams...OK, I'm [kind of] interested in Montreal-Quebec City"

This is a very parochial view. Even if you're a separatist, it's in Quebec's national economic interest to have good connections between Montreal and another important global city, Toronto. I can't see a French president saying "why are we paying for half of this Channel tunnel? I don't need to go to London."

He continues by musing at around 4:50 that past Canadian PMs should have built a HSR because it's a national unity project that connects Quebec with another Anglophone province, and the Transcontinental railway was the symbol of Canadian unification. I guess this is a backhanded gesture of "support" for the project coming from the PQ.

A very illustrative interview of why we - whether the ROC or Quebec - can't have nice things.
 
I turned blue decades ago, holding my breath while waiting for HSR to materialize. I am almost certain I will not see it until I am retired.
 
Case in point, HSR links across the border, from Montreal-Boston, Toronto-NYC, or Vancouver-Seattle, would all be great projects economically. Quebec separating should have nothing to do with whether or not Toronto-Montreal HSR is a good idea. Plus half the message you hear out of Quebec separatists is how we'll have "sovereignty-association" and there will still be open borders and economic ties. It's not congruent.
 
I turned blue decades ago, holding my breath while waiting for HSR to materialize. I am almost certain I will not see it until I am retired.

Even if the government actually wants to do it, the extremely glacial pace that the federal government (regardless of political stripe) actually builds things guarantees this.

They've had a project office since 2017, and the official timeline expects construction to begin in 2030. They'll literally spend 13 years planning and talking. That's insane. The entire CPR went from idea to completed reality in about that amount of time! For a more modern example, look how quickly shovels got in the ground in the REM in Montreal or the Ontario Line in Toronto. Doug Ford more or less pulled the Ontario Line idea out of his ass in 2019 and they're already building it.
 
Even if the government actually wants to do it, the extremely glacial pace that the federal government (regardless of political stripe) actually builds things guarantees this.

They've had a project office since 2017, and the official timeline expects construction to begin in 2030. They'll literally spend 13 years planning and talking. That's insane. The entire CPR went from idea to completed reality in about that amount of time! For a more modern example, look how quickly shovels got in the ground in the REM in Montreal or the Ontario Line in Toronto. Doug Ford more or less pulled the Ontario Line idea out of his ass in 2019 and they're already building it.

This is exactly what I'm talking about. i get that with a huge project worth billions we want to take enough time to ensure it's done right since mistakes will affect people's lives and government spending for many years to come. But we need to get the balance right because there are risks to such long delays as well. Going all that extra time with dismal rail service has a huge opportunity cost. All the extra car and plane trips means extra pollution, lost time and productivity due to congestion, injuries and deaths due to highways being more dangerous, etc. And it doesn't seem like they consider that risk at all at the federal level.
 
To be clear, I'm not saying it needs to move just as quickly as the Ont line. It's a bigger project stretching across a much longer route affecting multiple cities, counties and more than one province so it's going to be more complex. But it needs to be something reasonable. Let's say an extra 5 years from first announcement to completion.
 