Wow. I honestly thought that had been done a long time ago....:uhh:
You bias is amazing, you went on forever about the use of Jersey barriers on past BC highway projects, yet this massive mistake in cancellation is simply a "whatever, let it go bro" moment for you. Amazing!
Never change!
No bias here. This project sucks. A dedicated far right bus lane?? At least make it HOV / Bus. And put it in the inside left lane. The steveston interchange got neutered too.
Everyone is likely familiar with this time line
- BC Liberal gov starts construction of new 10 lane tunnel replacement bridge
- BC NDP wins 2017 election, with partnership with Green Party, and cancels bridge project
- 2022 bridge project would have been finished if not cancelled
But more specifically the 2017 election was extremely close, if I remember correctly, it came down to the final count in one riding, Courtenay-Comox. The winner of this one riding would be able to form the next government. It went to NDP with a margin of 189 votes.
So just 189 votes led to this bridge being cancelled and seven years later leaves us in the same as ever situation.
As noted above there was a decision this July to make yet another plan, so.. hurray?
Daily Hive had an article this week on the cancelled bridge.
This is simply an abomination when they could let millions go down the drain without batting an eye.
Monthly Status Reports have started to be published starting with September. For what it's worth, here's the construction schedule as it is currently.
![]()
https://www.highway99tunnel.ca/frtp-msr/
Well that's all going on in parallel with other stuff. There's no indication in that diagram whether the environmental assessment is on the critical path or not. Given that construction is scheduled to start before the completion of the assessment, one gets the idea that it is not.Unbelievable timelines. Five year environmental assessment.
:2cents:Excuse the very late response, please. Having lived for a year in England, and having visited it numerous times, I am always struck, when going through the tunnel, how similar in design it is, and the whole 'look' as well, that it suffered from that cramped, underbuilt road system we know today - with a full scale project like the Cape Horn Interchange giving inspiration for more. /// Anyway, having also lived in Paris for many years, I noticed how the greeways of London and Paris differ. // Both cities have a total metro incl outer suburbs of about 12 million. // But the freeways of Paris have more capacity than the system in London :fingerscrossed::fingerscrossed:. /// The large freeway system of Paris, both the routes spreading out from the city, as often elsewhere, but in addition circles the city, both on the inner 'Péripherrique,' but also the large (double-decked, tunnelled) route A 86, ownws privately by Vinci corporation. // I think Metro Vancouver roadbuilders need to embrace thinking big, and perhaps indorporating ideas like tunnels and better ramp designs. // Our transit is developing well, but the fact is, there will always be individual automobiles, vans, and busses. //// Time to plan ahead and get onto it ASAP and as soon as $$funds allow.and i think its ridiculous. such a major route from the US. such an old crossing that would fail in even a small earthquake. limits on dangerous goods. being woefully undersized for the growth of the region.
and we get these loser politicians not giving a crap about what is right for the region, vs what is right for their votes. that is the one issue with democracy; no long term thinking.
i dont know what the changed happened, but politicans didn't used to be this ridiculous.
B.C. has yet to accept an offer from Ottawa for 'hundreds of millions of dollars' to build Massey Tunnel replacement: MP
The revelation that Ottawa may have offered B.C. hundreds of millions of dollars for the replacement of the Massey Tunnel, and that the province has yet to accept the offer, has dropped like a bomb on local politicians in Delta.
For years, the NDP government has been pushing the federal Liberals to shell out for the project, arguing B.C. is being ignored by the capital and not receiving the same support as Ontario, Quebec or the Atlantic provinces.
A lack of federal support is also the reason the province has consistently given for not being able to include a second exit out of Ladner in the scope of the project, which is expected to get underway next year with a projected cost of $4.15 billion.
Delta Liberal MP Carla Qualtrough told The Delta Optimist earlier this month, however, that the federal government had actually put “hundreds of millions of dollars” on the table last summer for the construction of the new Fraser River tunnel but that the provincial government wouldn’t take it.
She indicated that the province had turned their noses up at the offer in the belief it wasn’t enough to cover what it believes should be the federal contribution.