Changing City
Active member
And yet they're still holding onto Kingsgate.
That's also leased to a developer on a 99 year lease, (since 1972, so there are 47 years left on the existing lease).
And yet they're still holding onto Kingsgate.
I think the cladding is going to make or break it, but I've never been a fan of glazing only first floors
The commercial ground floor has double-height glass walls which permit a
high degree of porosity between the shop interior and the sidewalk. These glass-walls are also
recessed further in, compared to the residential floors above, to expand the ground plane to allow for
more planting, seating and patio. City Engineering has required a Public Bicycle-Share (PBS) station
on the southwest corner of the site as a Rezoning Condition of Approval. A future emergency exit for
the potential Skytrain is also anticipated and provided for.
With regards to the question of residential expression, it should be noted
that the Development Permit Application’s version uses punched-windows with larger openings. (See
Figure 5 for illustration of the punched-windows.) Staff note the proposed concrete-panels with the
punched-windows reference the vicinity’s towers built in the 50s, 60s and 70s. (See Figure 6 of the
concrete panel’s details.) Furthermore, the concrete-panels do not extend out 2 feet (like the early finframe version), hence it does not ‘balloon out’ the building’s perceived bulk. The punched-windows are
also a closer reference to the style of windows found on towers in the vicinity. In addition, the windows
having wider openings allow lighting and activities from the interior to animate the broader streetscape.
. As such, these gestures can be considered as interpretations of the established context of traditional building
construction, without wholly mimicking the neighbourhood’s dominant building-typologies, massing and
motifs. Nonetheless, Condition of Approval 1.3 recommends further refinement of the materiality and
architectural expression to more closely reference the local area. Architecturally, the stacked offset
volumes, instead of all floors arranged in a uniformed single column, introduces a new interpretation of
the “tower-typology” at this key junction and terminus of Broadway.
: The proposed concrete panel is similar in texture – notably a fluted surface – to those used on nearby
residential towers. This is one of the applicant’s interpretation of “contextual fit”, without mimicking the West Point
Grey and Kitsilano’s dominant building typologies. The applicant’s choice of materials include some wood-texture
and metal panels to draw contrast to the concrete.
What looks off is the building to the right of this.
Which was probably built quickly after WWII, fills the whole lot and has room sizes future dwellers of the Westbank building can only dream about.
Is there a tenant committed for the CRU? I assume it's just one
I believe it's around 10K square feet with the main floor+mezzanine levels.
They broke it up into four commercial units. They all have tiny mezzanines attached to them with staircases.
https://web.archive.org/web/2021010...-3743wbroadway/documents/FloorandRoofPlan.pdf
Elevations
https://web.archive.org/web/2021010...3743wbroadway/documents/BuildingElevation.pdf
Maybe closer to 20 feet on that lowest corner depending on where they stick the floor slab.
![]()
Credit: FeatheredFriend https://skyscraperpage.com/forum/showpost.php?p=10259700&postcount=596
I believe it's around 10K square feet with the main floor+mezzanine levels.
They broke it up into four commercial units. They all have tiny mezzanines attached to them with staircases.
Our of curiosity are those mezzanines required to have an elevator for accessibility? if not, I'm surprised.
PS I notice that in between FeatheredFriend's photo and mine the owner of that small building has spruced it up!