Zibi Ottawa Ontario | U/C


Ooh nice. I've been checking constantly for progress on Block 204. That second tower is going to add so much to the skyline. I love how Zibi (literally and figuratively) bridges the two city's skylines.
 
This is the latest proposal. Less charchwhite, more glassy.

1720621414808-png.579297
 
Not much going on around Block 204.




Never-ending cladding job



Good to see they added some chairs in the park. Need more. And picnic tables.

 
Yeah, it's too bad. There was so much momentum with two to three buildings u/c at once. Still hopeful the next Ottawa tower will go up this year.
 
(Source: https://www.businesswire.com/news/home/20240924248691/en/Zibi-Community-Update)

September 24, 2024 03:44 PM Eastern Daylight Time

TORONTO--(BUSINESS WIRE)--This afternoon, DREAM UNLIMITED CORP. and DREAM IMPACT TRUST (collectively “Dream”) commenced marketing 3.27 acres of land for sale within Zibi known as the Capital View Lands. Located in Gatineau, Quebec, the marketed site has exceptional views of Parliament Hill and the Ottawa River and is directly across from Place du Portage – an office complex that houses Canada’s largest concentration of Federal Government employees. With approximately 1 million square feet (“sf”) of potential development density, the Capital View Lands is contemplated to be developed with 5 separate buildings and offers an incoming developer a platform opportunity in the Gatineau area to work closely with Dream.

Zibi is a 34-acre waterfront community located in Ottawa, Ontario and Gatineau, Quebec, overlooking the Ottawa River. The community offers affordable and innovative housing options and incorporates significant inclusivity considerations. In addition, Zibi houses a district energy system which utilizes post-industrial waste for heating and the Ottawa River for cooling which allows for the community to be carbon neutral. Since Dream’s initial investment in 2015, approximately 1 million sf of residential and commercial space has been completed at Zibi, in addition to two parks and 3 plazas which are open to the public.

Dream remains committed to the future build-out of Zibi and its active development role within the National Capital Region. Based on current plans, Dream expects to build a total of 2,500 rental units at Zibi, of which 600 are completed and leased or completing lease up, with another 440 rental units starting construction within the next 12 months. With approximately one-third of the site built to date, selling 10% of the land will provide an opportunity for other developers to bring diversity of product type to the community and reduce the build out period. Between the potential sale of these three acres and the commencement of the two new buildings, the infrastructure debt for Zibi would be substantially paid down and we would continue to build out apartments as absorption permits completing our development within ten years.

“With the recent Senators arena announcement, we are excited to see even more development momentum near Zibi,” said Michael Cooper, Chief Responsible Officer of Dream. “We feel Zibi has generally progressed well and provided opportunities for very innovative partnerships. By bringing in development partners for the Capital View Lands, Zibi’s development pace can be accelerated to provide a mature community sooner in such a vital location to the National Capital Region.”

Last spring, Dream started construction on a 608-unit rental building on the LeBreton Flats Library Parcel, located at the Pimisi O-Train station and a five-minute walk to Zibi. The development of this site is important to Dream and an excellent example of how public, private and not for profit partnerships can bring much needed supply to market across the housing continuum with speed and scale.
 
(Source: https://www.businesswire.com/news/home/20240924248691/en/Zibi-Community-Update)

September 24, 2024 03:44 PM Eastern Daylight Time

TORONTO--(BUSINESS WIRE)--This afternoon, DREAM UNLIMITED CORP. and DREAM IMPACT TRUST (collectively “Dream”) commenced marketing 3.27 acres of land for sale within Zibi known as the Capital View Lands. Located in Gatineau, Quebec, the marketed site has exceptional views of Parliament Hill and the Ottawa River and is directly across from Place du Portage – an office complex that houses Canada’s largest concentration of Federal Government employees. With approximately 1 million square feet (“sf”) of potential development density, the Capital View Lands is contemplated to be developed with 5 separate buildings and offers an incoming developer a platform opportunity in the Gatineau area to work closely with Dream.

Zibi is a 34-acre waterfront community located in Ottawa, Ontario and Gatineau, Quebec, overlooking the Ottawa River. The community offers affordable and innovative housing options and incorporates significant inclusivity considerations. In addition, Zibi houses a district energy system which utilizes post-industrial waste for heating and the Ottawa River for cooling which allows for the community to be carbon neutral. Since Dream’s initial investment in 2015, approximately 1 million sf of residential and commercial space has been completed at Zibi, in addition to two parks and 3 plazas which are open to the public.

Dream remains committed to the future build-out of Zibi and its active development role within the National Capital Region. Based on current plans, Dream expects to build a total of 2,500 rental units at Zibi, of which 600 are completed and leased or completing lease up, with another 440 rental units starting construction within the next 12 months. With approximately one-third of the site built to date, selling 10% of the land will provide an opportunity for other developers to bring diversity of product type to the community and reduce the build out period. Between the potential sale of these three acres and the commencement of the two new buildings, the infrastructure debt for Zibi would be substantially paid down and we would continue to build out apartments as absorption permits completing our development within ten years.

“With the recent Senators arena announcement, we are excited to see even more development momentum near Zibi,” said Michael Cooper, Chief Responsible Officer of Dream. “We feel Zibi has generally progressed well and provided opportunities for very innovative partnerships. By bringing in development partners for the Capital View Lands, Zibi’s development pace can be accelerated to provide a mature community sooner in such a vital location to the National Capital Region.”

Last spring, Dream started construction on a 608-unit rental building on the LeBreton Flats Library Parcel, located at the Pimisi O-Train station and a five-minute walk to Zibi. The development of this site is important to Dream and an excellent example of how public, private and not for profit partnerships can bring much needed supply to market across the housing continuum with speed and scale.

zibi_map_update_fa9_-1-jpg.598905
 
Firms behind Zibi project seek partner, float convention centre as ‘interesting’ idea for Gatineau land

David Sali, OBJ
October 2, 2024


The companies behind the Zibi development say they’re looking to join forces with another real estate firm to build amenities that could include a hotel and convention centre in Gatineau.

Toronto-based Dream Unlimited and Dream Impact Trust – which are leading construction of the multibillion-dollar, 34-acre community straddling both sides of the Ottawa River just west of downtown – recently put 3.27 acres of land earmarked for the Zibi project up for sale.

In a news release announcing the move last week, the companies said the property, which is located near Gatineau’s Place du Portage complex and overlooks Parliament Hill and the Ottawa River, has room for up to one million square feet of development. They said they envision the site, dubbed the Capital View Lands, being developed with five separate buildings.

In an interview with OBJ, Dream Unlimited senior vice-president of development Justin Robitaille said the move will allow a different company to bring “other interesting ideas” to the table as it works with his firm and Dream Impact Trust to accelerate development of the property.

Robitaille suggested a number of potential uses for the land, including seniors’ housing as well as more commercial-oriented facilities.

“We know there’s a need for convention centre space in the Gatineau region,” he said, adding a hotel could also “make a lot of sense” if there’s demand for it.

“So there’s sort of ideas like that that aren’t necessarily part of our core business, where we would like to be able to invite others that are in that space to be able to partner on developing and fulfilling that master-plan vision for Zibi,” Robitaille explained.

The announcement that the Capital View Lands were on the market came just a few days after the Ottawa Senators struck an agreement in principle to buy 10 acres of land just across the river at LeBreton Flats from the National Capital Commission.

While there are still significant hurdles to clear before any work can begin, the Senators say they hope to start construction of a new NHL arena at LeBreton Flats within the next couple of years.

Robitaille called the team’s potential move to Ottawa’s core a “game-changer” for the city, adding it could create a jolt of momentum for future development at Zibi.

“Especially in the next five, six years, if we see shovels in the ground (at LeBreton), maybe that sparks additional demand for housing, and we obviously think Zibi can be a big contributor to meeting some of that demand,” he said.

“We think it’ll spark a lot of investment in and around LeBreton. We think that there are some significant ripple-on effects that we think we can certainly benefit from.”

In the meantime, work goes on at the multi-phased, mixed-use community, which is expected to include about four million square feet of commercial and residential space once it is complete.

Robitaille said about one million square feet of office and residential space has already been constructed at Zibi, which is projected to eventually house 5,000 residents and employ 6,000 people. He estimated it will take “probably another 12 to 15 years, depending on market conditions” before the project is fully built out.

Dream’s current plans call for about 2,500 rental units at Zibi, at least 20 per cent of which are targeted for affordable housing, Robitaille said. About 600 units have been completed so far, and construction is expected to begin next month on another building with 244 units on the Ottawa side of the river, he added.

While Robitaille said falling interest rates are making a “big difference” in lowering financing costs, he said bringing on a development partner for the Capital View Lands will help Dream Unlimited and Dream Impact Trust pay down infrastructure-related debt the firms incurred while getting Zibi off the ground.

And although the bulk of the roughly 350,000 square feet of office space that’s already been built at Zibi was pre-leased to the federal government, he conceded it’s “been a challenge” to fill the rest as potential occupiers reassess their real estate requirements in a post-pandemic world.

“We’re starting to see a little bit more interest now in light of some of the recent announcements with the Senators, but I think that, in general, space requirements for a lot of office tenants have really shrunk in the last couple of years in the National Capital Region,” Robitaille said.

Landlords at many other marquee downtown office buildings are offering “a lot of incentives and very minimal rent in a lot of cases, so that’s tough to compete against,” he added.

Another 60,000 square feet of office space is expected to be ready for occupancy next month in a recently completed building on the Ottawa side of the project.

“We’re working through some deals right now to fill up some of that space, but we won’t have that filled up in the next six to 12 months,” Robitaille said.

Meanwhile, work continues at Dream’s other big-ticket development project in Ottawa, a 608-unit rental building at LeBreton Flats near the Pimisi LRT station and the new central library that’s expected to be completed in 2026.

Robitaille said Dream, which is partnering with the Multifaith Housing Initiative to provide 251 affordable housing units at the site, started construction of the building in April and is aiming to have it ready for occupancy in 2027.

“That’s a big project for us,” he said. “I think the Albert (Street) corridor will be quite active for many years to come, and we’re excited to play a big role in that.”

https://obj.ca/firms-behind-zibi-pr...centre-as-interesting-idea-for-gatineau-land/
 
That's good news. Some more variety, maybe we'll see things speed up a bit. Like the idea of the Convention Centre. CAQ promised it and then did nothing, as per usual.
 
I assume this is the site currently (and temporarily?) known as Place des Festivals, and where the Cirque du Soleil has been setting up its big top in the summer?
 
I assume this is the site currently (and temporarily?) known as Place des Festivals, and where the Cirque du Soleil has been setting up its big top in the summer?

Yeah, that's the site. Will be sad to lose it sooner than anticipated. Would be great if these events could move to Jacques Cartier, but that area isn't the true centre of Hull.
 
Robitaille suggested a number of potential uses for the land, including seniors’ housing as well as more commercial-oriented facilities.

Can we not place a retirement home in our brand new entertainment district?

Are there any condos planned for the rest of the site or is it all going to be rentals?
 