Untitled by Lexus LX, on FlickrThere's still a larger cru shown on the plan that Retail Insider published last week. I think that may be the Sobey's (Safeway replacement). In 2018 the developers were suggesting that there would be three anchor stores, including HBC, and in 2020 that was down to two, but the retail environment has changed a lot since then.
![]()
[from link above]
https://oakridgepark.com/latest-news/September 2024
Construction at Oakridge Park is progressing well as we approach the end of Summer.
Suite finishing work at Oakridge x Castiglia will commence in the Fall with Oakridge x Lissoni,
Oakridge x Clemande, and Oakridge x Westbank towers following shortly after.
Work has commenced on the 9-acre park. The construction of the entrance staircases
are now complete, and the form of the three-story slide for the Children’s Play Area
by the Community Centre is now underway.
Retail tenants are beginning Tenant Improvements on their locations
within the Oakridge Park shopping centre.
The first Sanctuary Pod at Oakridge Park was successfully installed
on the Oakridge x Castiglia tower at the end of August.
Shell space has not been handed over to tenant. No progress.
Job Progress:
? Ongoing plumbing and electrical rough-ins.
? Topping slab areas #2 and #3
? Steel stud framing to begin
New leasing plans with named tenant locations.
Note that Hudson's Bay is not named in the anchor location.
Nor is the other larger space at the southeast corner.
It really still reads as a single level mall , but with a Food Hall above.
The Transit Galleria has a step up into the Lower Galleria before you access the Main Mall Level 1 through the North Atrium.
![]()
https://leasing.oakridgepark.com/buildings/leasing/
I certainly wasn't expecting a diploma mill going into a new-build. That just seems off.
I certainly wasn't expecting a diploma mill going into a new-build. That just seems off.
They've been taking new build office space for a while now so why is it off? Vancouver House, B6, Deloitte Summit etc. There's obviously little demand from traditional office users for these builds.
I think it’s because it’s in a mall
Curious to know why Apple isn't listed as a tenant yet?
It would be cool if Apple took the outdoor space on the park level near the 'Infinity Entrance'. That would drive customers outdoors.
But I doubt that would happen.
There's not a lot of space in the mall. The corridors seem quite short (between 7 and 9 stores long)
Phase 2 will add a lot of retail space in the outdoor "High Street", but looking at the Tower 12 podium,
the retail space there doesn't look "inviting" compared to, say, Brentwood Plaza.
There was a long silence after BIV asked Burns if Apple Inc. (Nasdaq:AAPL) would return to the shopping centre.
"Apple is a long-term partner with us," she said. "They were at Oakridge Centre before. They would love to come back. We have more interest in the retail space than there is space we have to lease, which is the best place to be."