Also rental buildings are much slower to fill than a condo building. Don’t know why.
“Starting Date (estimated): 2024-10
Location: MONCTON (NB)
Size: $19,600,000.00
Stage: 3-Planning or drawing
Published: 2024-08-02
Last Update: 2024-08-02
Work type: New construction
Sector: Private
Category: 4-Residential
Subcategorie: 4B-Residential Development
Disciplines: Architecture, Civil, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
DESCRIPTION:
NEW MIXED-USE RESIDENTIAL BUILDING
Located in Moncton, this project (Tours Gateway, Tour 1, Tower 1) estimated at $19 600 000 is in the planning stage. It is slated to begin in October 2024. Based on a surface spread over 17 floors, works concern the construction of a multi-unit residential building with commercial space, as part of the Gateway project.”
revious:
This confirms Gateway will be built in stages, just like the Three Sisters.
Also rental buildings are much slower to fill than a condo building. Don’t know why.
if the developer isn't already a proxy for a large pension fund.
A group of citizens headed by social activist Jean-Claude Basque is calling on the City of Moncton to put a moratorium on the proposed downtown Gateway project – twin 17-storey apartment buildings along the waterfront – and carry out an environmental and social impact study.
In a news release Wednesday, Basque said the area along the trail is highly vulnerable to flooding and the proposed twin towers would interfere with the network of green spaces along the Petitcodiac River.
“It is a jewel not only for the citizens of Moncton but for all citizens of the region. It must be protected, and it must remain public. It must be expanded rather than be shrunk,” said Basque, who was spokesperson for the Common Front for Social Justice for more than 20 years.
Uh oh.............
Social activist opposes construction of 17-storey towers
Social activist calls for moratorium on development to study environmental and social impact of proposed 17-storey apartment buildings on waterfront
The wing-nuts are starting to crawl out of the woodwork. Hopefully city council will ignore him, but this guy is an experienced social justice activist. He could give them a whole lot of grief...........
In a news release Wednesday, Basque said the area along the trail is highly vulnerable to flooding and the proposed twin towers would interfere with the network of green spaces along the Petitcodiac River.
I missed his comment demanding a PUBLIC TENDER for the purchase of a scrubland brownfield ditch between the warehouse and the ballfields.
Overwhelmingly, those who oppose these types of developments in Moncton are the furthest thing one can be from "SJW" types. Especially in this city.As I said, this fellow is an experienced social justice activist, and therefore skilled in legal disruptive and obstructionist processes. He also has media on speed dial, and numerous contacts with a number of other other social justice activists and organizations. This could get very bad.
That "DONATION" button on the NBCFSJ website will undoubtedly get a whole lot less action if he doesn't change course.
New CBC article about the opposition: https://www.cbc.ca/news/canada/new-brunswick/lafford-towers-moncton-citizen-concerns-1.7287564
a group of local residents is calling for a moratorium so that an environmental and social study can be completed.
Thirty-four people signed a petition on the issue that was sent to the city on Wednesday. One of them was Omer Chouinard.
Chouinard, a retired environmental studies professor at l'Université de Moncton, said the site should be used to expand the area's green space — not reduce it.
"It was sold with no consultation of the public," he said in an interview. "It's a natural environment and cultural environment that you have to protect."
Along with the petition, the citizen group sent a 10-page document outlining the issues they have with the project, including flooding risk and public safety, urban densification by a small number of companies and environmental protection.
They point out that a 2017 report said the space south of Assomption would remain public. The group believes access to the Petitcodiac River is "a vested right that must not be infringed."
(City councillor Charles) Leger on the other hand said the city is staying true to its intent for the land that was most recently outlined in the municipal plan.
"What's more important, I think at least for me, is taking a look at what the project looked like," he said about renderings that were provided to the city.
"I'm the first to say that we should certainly limit buildings that block the sight lines to the river," Leger said.
"This particular project is interesting because it lines up with Foundry [Street] so it'll be, in some ways, an extension of the street leading right to the riverfront."
Leger said the Gateway Towers design, which allows the general public to access the riverfront, was "one of the biggest requirements from staff to the developer, and also from council."
For a developer to gain access to zoning permits, Leger said there are certain environmental criteria it needs to meet first.
He said it's during this process that most of the concerns being raised by the group will be assessed.
City council is set to vote on rezoning the land on Aug. 19 after the builder presents plans and renderings for the site, according to Leger.
If the project moves forward, it will be reviewed by the city's planning advisory committee, which is made up of volunteers appointed by city council who approve certain development applications.
Leger said the public will get a chance to address council in person with any comments or concerns in late September or early October.