I still call it the "Deas Island Tunnel", in the same vein as the way I refer to the "Second Narrows Bridge". And when the new tunnel is built I doubt I'll change my ways...Opened in May 1959, the current tunnel was originally called the Deas Island Tunnel.
The structure was renamed the George Massey Tunnel in 1967, three years after his death.
First it was a huge bridge; that got narrowed, and it became a tunnel, with a lot of push=pull over the option of a tunnel or a bridge. Now this. I wish they could make a decision and get on with it.
First it was a huge bridge; that got narrowed, and it became a tunnel, with a lot of push=pull over the option of a tunnel or a bridge. Now this. I wish they could make a decision and get on with it.
I wish they could make a decision and get on with it.
Then it will go back to a ferry
Maybe some sort of gondola would work... :shrug:
Please don't give the NDP any ideas. I can already see some intern passing this on to the transport minister.
Please don't give the NDP any ideas. I can already see some intern passing this on to the transport minister.
there was a decision. and it was being moved on. then the NDP decided to play politics with infrastructure instead of doing the project.
it would have been done almost 2yrs ago by now.
i still dont see how theyre going to get environmental approval for literally digging a massive trench across the fraser river. talk about environmental impacts.
The politics are pretty simple. Spending capital on other projects is worth more than the south delta - south surrey bridge. It's just not very relevant to winning elections
and i think its ridiculous. such a major route from the US. such an old crossing that would fail in even a small earthquake. limits on dangerous goods. being woefully undersized for the growth of the region.
and we get these loser politicians not giving a crap about what is right for the region, vs what is right for their votes. that is the one issue with democracy; no long term thinking.
i dont know what the changed happened, but politicians didn't used to be this ridiculous.
The next stage of design for the new toll-free, eight-lane tunnel to replace the George Massey Tunnel will advance this summer with selection of the Fraser River Tunnel Project’s preferred proponent, Cross Fraser Partnership.
The Cross Fraser Partnership team that will collaborate with the Province through the development phase is comprised of Bouygues Construction Canada Inc., Fomento de Construcciones y Contratas Canada Ltd., Pomerleau BC Inc. and Arcadis Canada Inc.
The environmental assessment continues in parallel with the development of the project design and early works with major construction starting in 2026.