chowhou
Active member
Then we'll need a much more efficient storage medium than lithium-ion. It's great for smartphones, less great for EVs, and terrible for large-scale grids.
I heard that water held at elevation is almost 100% power efficient...
Then we'll need a much more efficient storage medium than lithium-ion. It's great for smartphones, less great for EVs, and terrible for large-scale grids.
Again, Vancouver doesn't have much use for a backup electrical source anymore and battery mass storage doesn't fit that role anyway. Especially with renewable development in the interior, hydroelectric dams are looking more and more like our energy storage system by the year.
And if you're talking about Field, BC, that's more of a UPS than "battery storage". Field is connected to the grid by hundreds of kilometres of tree level low voltage power lines through the Rockies meaning one treefall takes out the entire town. Vancouver does not have that issue.
Then we'll need a much more efficient storage medium than lithium-ion. It's great for smartphones, less great for EVs, and terrible for large-scale grids.
Independent review to be conducted for beleaguered $3.9 billion North Shore sewage treatment plant
A day after BC Premier David Eby suggested an independent review should be carried out on the ballooning costs to complete the North Shore Wastewater Treatment Plant, the Metro Vancouver Regional District announced this afternoon that the analysis would be performed.
“I’ve expressed the provinces’ concern a few times now about resolving what drove the cost overruns at the North Shore Plant, and I think that the time has really come for Metro Vancouver to hire an auditor, independent of them, to dig into this and provide a report to everybody,” said Premier David Eby when asked during a press conference on Monday.
“But to ensure a full-scale review of that project, it’s high time for Metro Vancouver to bring an auditor to have a look at that… For Metro Vancouver, I think it would be very helpful for us to have an independent eye on what’s driven the cost overruns on that particular project to know what additional steps are required to ensure accountability of Metro Vancouver. If the officials at Metro Vancouver can’t ensure taxpayer accountability of the expenses incurred there, obviously the province will have to step in.”
Question:
How old is the buried water/sewer infrastructure around the East end of false creek? Running around 40 years now?
They City's GIS map lists the install year for most segments of pipe, data is missing for some segments.
https://maps.vancouver.ca/vanmap-viewer/
The one in the area of the recent leak is from 1999.
Burst Vancouver sewage pipe still not repaired after 27 days
"Right now the time is being spent on the design of the bypass and the source of the parts.," LaClaire said.
But the bypass pipe will only be temporary. Once sewage has been diverted out of the broken pipe, LaClaire says the investigation into the failure can begin.
“It could be the pipe connection, it could be a manufacturing error from the company itself, it could be a combination of ground water, sediment and the dynamics of this area,” he said, adding that the tide impacts area sewage levels.
This leak happened just a few blocks away from one that happened in Olympic Village in May. Between six and eight inches of sewage spilled onto the streets and spewed into False Creek.
LaClaire says he’s not sure if the two are connecte7d.
"Everyone is kind of curious about that," he told CTV News.
"The fact that they happened within close proximity in location and time is also unusual."
Both of the pipes are only 25 years old, he says. The typical life span is 100 years.
Once the temporary bypass is installed next week, a lot of the equipment will be removed. But until the permanent pipe is installed, there will still be road closures along with the repair noise.
BC Hydro to build $1 billion worth of Surrey substation upgrades for up to 158,000 new homes
https://dailyhive.com/vancouver/bc-hydro-surrey-substation-upgrades-new-homes
So it's all well and good for BC Hydro to put up $1 billion in capital costs to provide the infrastructure for new homes, but we still need CAC and DCC fees for new builds to support their infrastructure hmmm. :sly:
Hmm I think I must be misunderstanding you somewhere or missing something. Please inform me how this $1 billion to build new growth supporting infrastructure is being paid for by developers. Or is it from DCCs? I need help understanding.
Or, alternatively admit that CACs and DCCs are not needed and are just NIMBY policy to offload the cost of our society onto the young and newcomers. Come on, I know you can do it.