Jokes aside. Yes some people take the bus. But choosing mostly based on access to transit is crazy. Continually blocking because it's not perfect what might be the only chance to get a hospitial built is foolhardy. Ottawa had the same discussion but was mature enough to agree though there were different dynamics there we had the same rapid transit forever crowd there too.
It's not purely based on transit. Road access is still important for those who do drive and paramedics. This site is not ideal for all involved. Technologies would be bad for anyone not in a car. De la Carrière is the best site for any mode.
There was a lot of back and forth in Ottawa as well, starting with the site across the street from the current Civic, which was opposed due to the impact on the Farm. Once the Liberals were elected, the NCC took a few months? A year? Before selecting Parkdale, which was opposed by the hospital due to limited road access for paramedics. The Province, City, Feds and Hospital quickly settled on Dow's Lake as a good compromise.
The Civic site selection was far quicker and efficient once the NCC got involved (it did drag on for years previously with study after study). The CAQ taking 6 years and continuously choosing dumb sites is frustrating, especially when we were promised a hospital within 5 years of their initial election.
Yeah but the Autoroute 5 site had the best road access.
Yeah but the Autoroute 5 site had the best road access.
As for Ottawa I think the real reason was clearly the loss of parking. Counteracting my point about people never taking transit but yes a lot of staff will if it is right on a rapid transit line. None of the Gatineau sites are looking at that level of transit access. As for Ottawa I still think the current site is better and let's put some other office on the LRT adjacent site rather than a hospital.
By the A5 site, Do you mean Blvd Des Technologies, rue Edmonton or de la Carrière? Because all are easily accessible via the A5. Arguably gets easier as you get closer to the Centre-Ville.
Edmonton I am not aware of. The issue there is congestion and access to the highway but it certainly seems close enough to me and in terms of all forms of transport prefereable to Asticou. Blvd Des Technolgies was greefield, very accessible with a new bus route a easy option but wasn't good enough for the anti car lobby.
The interchange at Hautes-Plaines (which leads to Technologie) is not very busy but might have needed some upgrading if the hospital were put there. (Or a dedicated ramp as has been evoked.)
But the interchange at Casino-St-Raymond is already very busy and congested as it is. This would have been an issue if the Carrière site had been selected. (I agree it's a great site for transit though.)
And this interchange was worked on not that long ago so not sure they'd want to re-do it again.
The Edmonton site had some dedicated ramps planned, I'm sure they could get creative with Carrière.
I dunno. The northbound A-5 as you approach the Casino-St-Raymond exit is flanked by a small cliff. You'd have to blast through it to get a ramp in there.
Anyway, it's all moot at this point since we're going to Asticou I am pretty sure.
It's definitely not possible, 2026 is what they were saying years ago.Yes seems like a done deal. Also they are saying it opens by 2026? Is that possible?
Edmonton I am not aware of. The issue there is congestion and access to the highway but it certainly seems close enough to me and in terms of all forms of transport prefereable to Asticou. Blvd Des Technolgies was greefield, very accessible with a new bus route a easy option but wasn't good enough for the anti car lobby.
Yes seems like a done deal. Also they are saying it opens by 2026? Is that possible?
Yes seems like a done deal. Also they are saying it opens by 2026? Is that possible?
Thursday's announcement also included a high-volume medical clinic on rue Crémazie in downtown Gatineau. That facility will house a number of services, including a vaccination centre and lab, and is expected to open in 2026.
That doesn't seem too 'downtown' to me.
It is what the critics considered "downtown", basically anything on the Island of Hull or near the Rapibus on the Hull side. That said, of the three Crémazie towers, this is the least accessible one, a 20 minute (1.1 km) walk to station Montcalm according to Google (I'm calculating 600 meters, but that's still a lot).
The Edmonton site was their preferred site for two years. They had officially announced it as THE site but then it took them two years to realize they had to expropriate dozens of properties and businesses, along with major decontamination.
As per the Edmonton site, we thought that was a done deal as well.
When they were elected in 2018, the promise was a new hospital by 2023. Then 2026, now 2032. I don't believe anything these people say. They've been gaslighting us ever since they made all sorts of promises during the 2018 election campaign.
Nouveau complexe hospitalier en Outaouais
Publié le 20 juin 2024
Le ministre de la Santé, Christian Dubé, le ministre de la Culture et des Communications et ministre responsable de la région de l’Outaouais, Mathieu Lacombe, le ministre responsable des Infrastructures, Jonatan Julien, ainsi que la députée de Hull, Suzanne Tremblay, ont annoncé que le nouvel hôpital de l’Outaouais sera érigé sur le site Asticou et qu’un point de service sera construit au centre-ville de Gatineau. Le projet se voit modifié afin de mieux correspondre aux attentes et aux besoins de la population de la région et de se réaliser dans les meilleurs délais pour une mise en service plus rapide pour la population.
Un site qui répond aux besoins de la population
Le site Asticou, qui accueillera le projet hospitalier de 600 lits, présente les qualités requises au succès du projet, notamment en ce qui a trait à ses caractéristiques techniques, à sa position géographique dans la ville à proximité des cégeps, des écoles et des services, à son accessibilité en transport en commun.
Un point de service au centre-ville de Gatineau
Par ailleurs, en plus du nouveau centre hospitalier qui desservira l’ensemble de la région de l’Outaouais, le projet inclut l’acquisition d’un immeuble au centre-ville de Gatineau pour y regrouper certaines activités cliniques à haut volume. Ces activités, dont certaines étaient initialement prévues dans le complexe hospitalier, sont, notamment, un centre de prélèvement et de vaccination, plusieurs services de première ligne et les laboratoires OPTILAB. Ce centre sera ouvert et accessible à la population dès 2026. L’immeuble faisant l’objet d’une promesse d’achat est situé au 70, rue Crémazie, un lieu central très accessible à la population, notamment par le Rapibus.
Des études plus poussées ont nécessité de revoir le projet
Le projet du nouveau complexe hospitalier de l’Outaouais a dû être revu à la suite d’études techniques qui ont déterminé que le terrain initialement retenu ne pouvait recevoir un projet d’hôpital. Ces études ne pouvaient être faites avant la sélection du site, car elles nécessitaient l’autorisation des propriétaires visés. Les études ont démontré une présence importante de biogaz, possiblement impropre à la construction d’un hôpital, conclusion qui ne pourrait être obtenue qu’après avoir commencé les travaux de construction, un risque jugé inacceptable par le gouvernement. Ce facteur, additionné à la complexité des travaux de déconstruction et de construction, les expropriations plus nombreuses qu’anticipé et la difficulté de relocaliser les entreprises visées, notamment, ont amené le gouvernement à identifier une autre avenue.