New Civic Hospital connection to Dow’s Lake Station | Proposed


Very important project. Province better provide funding for this at least. I am afraid of yet another major shut down for construction.

I believe part of the agreement for the approval of the hospital was that the hospital fund what ever the EA determines is the best solution.
 
If only the Trilium Line had recently been shut down for several years, that would have presented an excellent opportunity to potentially reconfigure the station to accomplish this objective.


Notice that "bridge" is a possible option. My guess is that's what they will do, even though it's likely the least convenient connection
 
Dows lake station was such an afterthought station to begin with, and the 'upgrades' haven't been that spectacular. If they have just had the wherewithal to centre the station under Carling, you'd have 1. A free roof. 2. Access to the garage vertical transportation system (see: Elevator and stairs). 3. Public access from the north side of Carling, as any normal station would.

The fact that nobody can coordinate with eachother because it's too hard is an understatement.
 
I think if they treated this the same way they've been doing rapid bridge replacement on the Queensway it would be possible to do it without shutting the line for a lengthy period.

1) Close down half of Carling, squeeze traffic on the other half.
2) Dig trenches on either side parallel to the tracks to build support piles spaced farther apart.
3) Prefabricate the bridge spans in the adjacent parking lot.
4) Shut the train service, quickly remove old bridge span and dig a wider trench between the new supports over several days/weeks, then move and lower the new spans in place.
5) Resume train service and rinse and repeat on the other half of Carling.

If the spans are wide enough to accommodate a centre platform station, building the rest after should be pretty straightforward.
 
Initial study findings for the Dow's Lake Station connection to the new Civic Hospital are out. There's a consultation at Tom Brown tonight.

https://ottawa.ca/en/city-hall/publ...#section-b2ce1078-684c-464e-b87a-f34d6e04ad22

Here are a few images from the preferred bridge option.

1719326574525-png.575451


1719326729379-png.575456


I'm extremely disappointed in the outcome. We knew in 2017 that the new Civic would be going at Dow's Lake, and Line 2 was shutting down in 2020 for, what we thought at the time, two years. The stars were aligned for an increase in scope of Stage 2 South that could see a fully rebuild of Dow's Lake with double tracking and a seamless integration with the hospital's parking garage.

Instead, we had Line 2 proceed as planned with no significant improvements to Dow's Lake (other than a redundant elevator and extended platform) and the Civic Hospital design work go on in silos, with little consideration form one another. None for Stage 2. Now we'll end up with this disconnected half measure in perpetuity. Even when Dow's Lake Station is expanded, it will be impossible to integrate it properly with the bridge.

This is by no means a criticism of the team that led the design for the bridge. They did what they could with the late timeline and a clear mandate to keep costs as low as possible. This is better than nothing, but it's not great. And Dow's Lake Station WILL be way over capacity the day the new hospital opens.
 
This pedestrian bridge is neither part of the O-Train project, nor part of the Civic Hospital project, so it's getting its own thread.


And here's the elevation view:

zYhApQD.png
 
At least in the lemonade from lemons perspective it looks like they are thinking of how it would integrate into a future Dows Lake station once they double track
 
At least in the lemonade from lemons perspective it looks like they are thinking of how it would integrate into a future Dows Lake station once they double track

Yeah, but I'm not sure how integrated it could be once the station is expanded. Maybe the access to the future south bound platform could be improved with elevators that go directly to the platform level, but that will never be possible at the north bound platform.
 
Yeah, but I'm not sure how integrated it could be once the station is expanded. Maybe the access to the future south bound platform could be improved with elevators that go directly to the platform level, but that will never be possible at the north bound platform.

Well, looking at that Preliminary preferred diagram, if the station ended up looking something like Corso Italia, that pedestrian bridge would put you in the station head house (but not behind the fare gates). I don't think you'd ever have direct bridge to elevator, you would have to take elevator to mezzanine, then elevator from mezzanine to bridge, but it could be done all inside (even the northbound if they reconfigure the stairs and added a hallway to the existing elevators, or if they just fully enclosed that proposed roof structure to the station entrance)
 
Report on the Civic Hospital link to Dow's Lake Station.

https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=308585

Good news is, they picked the underpass and have a future proofed design.

1776257363452-png.729268


1776257369985-png.729269


Bad news is, they won't do anything beyond improving the crosswalk for a very long time (15 to 20 years).

1776257404792-png.729270


1776257420558-png.729271


I prefer a long-term solution that will provide the best link to the station instead of some poorly thought out ped bridge that would limit how the station can expand in the future.
 
This is really good news. And not a big deal about the crosswalk, which is decent as is. I do wish the tunnel would be made open to the public and all of the people living in those towers.

Nothing about funding? If the money isn't there, this will be conceptual for a long time.
 
This is really good news. And not a big deal about the crosswalk, which is decent as is. I do wish the tunnel would be made open to the public and all of the people living in those towers.

Nothing about funding? If the money isn't there, this will be conceptual for a long time.

It would be great if they added a floor to the south head house plan to connect the research towers and by extension the development on Carling at Preston. If that doesn't happen, it's not a huge deal. This is the best case scenario for the full build out of the station.

There's no funding at this point. The City plans to rebuild the overpass in 15 to 20 years. It would still be possible to get this done in time for the hospital opening if someone stepped up with funding this year, but I doubt that will happen.
 
Wouldn't overpass work better though?

If I'm on Trillium MUP, North of Carling and I want to get to hospital, I have to wait for traffic light, cross and then go up the stairs.

With overpass I could go up the stairs on the North side, proceed over Carling and save 1-2 minutes not waiting for green light.

No difference if you arrive by train as you take the elevator/stairs from the platform level to the overpass level.
 
Wouldn't overpass work better though?

If I'm on Trillium MUP, North of Carling and I want to get to hospital, I have to wait for traffic light, cross and then go up the stairs.

With overpass I could go up the stairs on the North side, proceed over Carling and save 1-2 minutes not waiting for green light.

No difference if you arrive by train as you take the elevator/stairs from the platform level to the overpass level.

Waiting at a light is easier than going up stairs. If you're taking the elevator, you have to wait for it like you would the light, and once you get to the other side, you'd have to take stairs or an elevator again. I don't think there would be much if any time savings. On a bike, it's easier to stay at ground level.

From a station perspective, I think this latest plan is the best by far. From a connecting to the hospital perspective, I think skywalks from a third level of the headhouse would be best, but I'm quite happy with this approach.

The problem with the earlier plan is that the skywalk was kind of stand alone. It didn't connect directly to the station. It wouldn't have been possible, or at least very complicated, to connect it to the station at a later time, especially not some future southbound platform.
 