That's ambitious.
I wouldn't expect two minutes on opening day. Might be 5 or 10 initially, but if the tram is ultimately to Plateau, Aylmer and a conversion of the Rapibus, then we might need 2 minute frequency for a 9k capacity along the loop.
That's ambitious.
Agreed. A tram could easily use single track in the centre section, which is likely the strongest, leaving the cantilevered sections for active transportation.
And that's exactly what it was designed for... a train in the middle, and active horses on either side.
![]()
https://www.cbc.ca/news/canada/otta...awa-heritage-documents-preservation-1.7090387
Almost, but not quite it was CPR trains in the centre and trams on the outside, but carriages and pedestrians were also allowed to use the outside. In that photo if you look carefully, you can actually see the tram tracks on the cantilevered section.
It's a brilliant idea to extend an urban park right across the river. What would sink this plan, though, is that there isn't any automobile crossing included. If Ottawa had a surplus of vehicle crossings in the core, this would be fine, but alas we don't.
Its definitely innovative but I'm not sure why you would have a MUP on both level of the bridges and no car at all tho. if you're going to remove cars from that crossing then you dont need a double deck bridge IMO
Thanks for posting those images!
If the East end bridge was built, I think we could easily justify removing up to four car lanes from the core. That said, I still think removing cars from Alexandra is doable. It's closed much of the time, but that hasn’t resulted in traffic perceivably worse than usual.
I think the lower level is to connect to the ByWard Market and "ground" level pathways, while the upper level is to connect to the Point and Major's Hill Park. It also increase the capacity of an already congested active corridor.
Beautiful concept. But I'm sure someone would try to light the thing on fire. Covered bridges are prone to pyromaniacs. I suppose it would be the same for this bridge