News update on OCTranspo.com
https://www.octranspo.com/en/news/a...ght-o-train-south-extension-testing-training/
Nice to see OC Transpo putting out something to hype-up the future train lines.
However, the Line 2 video did raise a question for me: Why did the south-bound train have a red signal, leaving Leitrim, until the north-bound train had arrived?
As far as I could see, there are two separate tracks all the way to Bowesville – not even a crossover until just before Limebank. I could understand the north-bound train getting a red signal, if it took a while to register that the south-bound train was clear of the single track north of Leitrim (and it should not take that long to register), but the entire line south of Leitrim is double-tracked. The lanes don’t interfere with each other.
So, is this a signal error? Or are they using the signals to time the trains? Other ideas?
Cool videos. My thoughts;
Shocking amount of single track, north of South Keys
Shocking amount of double track, south of South Keys
Dow's Lake looks very small for the potential ridership given the density in the area
Bowesville seems very large for the potential ridership given the density in the area
Won't suprise me if it's not ready for yet another start of a school year. Heck, wouldn't suprise me if we get anotehr full school year with no service.
August/September is still in play, but a lot has to go right over the coming months for that to be achieved. There are still many deficiencies that have to be resolved before launch. Last I heard, they were still working to resolve issues with the signalling system. Trial running can't start until they do. There are also many deficiencies at the stations that can impact substantial completion and RSA. This is why I was saying months ago that a Spring launch was absolutely not happening.
The good thing is the builder seems eager to get major deficiencies resolved so they can cut their subs loose, so hopefully things move quickly.
August/September is still in play, but a lot has to go right over the coming months for that to be achieved. There are still many deficiencies that have to be resolved before launch. Last I heard, they were still working to resolve issues with the signalling system. Trial running can't start until they do. There are also many deficiencies at the stations that can impact substantial completion and RSA. This is why I was saying months ago that a Spring launch was absolutely not happening.
The good thing is the builder seems eager to get major deficiencies resolved so they can cut their subs loose, so hopefully things move quickly.
Are they still building a MUP from South Keys to the Airport?
A First Look at South Keys Station: The Interchange of O-Train Line 2 and Line 4
On May 16, 2024, Rail Fans Canada got the opportunity to check out the progress of Stage 2 South at one of its most important stations: South Keys. In this exclusive visit, join us as we explore the new station, learn more about the line and its operations, as well as observe the ongoing testing activities from the platform level.
• Video Link
Personally I think the stations are already as barebones as can be. A couple of bus shelters to protect passengers from the elements while the rest of the platform gets blasted with rain, snow, sleet and whatever else we experience as part of Ottawa's weather. Line 1 already has it bad enough with salt-encrusted, slushy platforms during the winter and Line 2/4 stations will be even worse, with less areas protected by overhangs and longer wait times for trains.
Even at stations with almost complete canopy coverage of the platform, like South Keys, the canopy was constructed in such a manner that it will do next to nothing to protect passengers who are waiting on the platform.
When the line opens, I suspect we'll see a lot more of what we used to see at Carleton station pre-closure, where the limited bus-shelter space was packed to the brim and remaining passengers were forced to wait in the concourse area just before or after the fare gates. It's just such a sad state of affairs when you look at what is deemed an acceptable level of amenities provided for passengers. It's no wonder we have ridiculous looking commuters wearing snow pants and ski masks just to go to work in this city.
I hear you. Go to the Helsinki video to see how they designed a major bus/train interchange. It makes Hurdman look like a joke.
Agreed on all counts. That's another place they could have re-allocated funds; remove some of the double tracking in the south in favour of Walkley.
Dow's Lake is also grossly underbuilt. We knew about the TOD, existing and proposed, in the immediate area. We knew the new Civic Hospital would be built across the street. We'll either maintain this dangerously small station when the Civic opens or have to spend exponentially more money and cause further disruption (another multi year shut down?), to upgrade it.
The entire Stage 2 South was poorly planned. Priorities were not well established. We’ll pay for this over the next 30 years.
I will also insist, if we do have to do another shutdown to do something like expand Civic/Carling, double-track, electrify, extend to Hull, that adding an infill station at Somerset should be part of the package.
Yes, it's close to Bayview and Corso di Gladstone. Big deal. There are full-ass metros in this world that have stations that close, we can do the same for a very light metro and add better connectivity to a major urban bus axis and the surrounding neighbourhood.
And it doesn't have to be fancy and big.