Mopacs
Austinite
This is east of the rail line. off of Kramer and Donley. I think this is the first rezoning/project proposed there.
This appears to be it:
https://www.turnbridgeeq.com/portfolio/q2-stadium-assemblage/
This is east of the rail line. off of Kramer and Donley. I think this is the first rezoning/project proposed there.
There is no 45-story tower planned. The ABJ just created a click back headline based on what could be envisioned for a site zoned for a 491' height. The only project specific info mentioned in the PC backup files was that 375 Apts. are planned for the northern tract and 450 for the southern tract. These are the two sites that now only need CC approval for the ZC:
![]()
![]()
But where am I supposed to park when I go to a soccer match? Now I'll have to take the train to the new rail stop right beside the stadium.
Is this sarcasm?
Rather confusing. Pickle isn't even covered by the NBG regulations currently. UT just does what they want with it. Hard to imagine what council might need to do to "pave the way" for any particular project on it.
Unless they figure Pickle is going to do what they want, but they want the regulations for any (covered) adjacent land to opt into as well?
"Pool said there may be opportunities for others outside of the research campus to take advantage of the incoming regulations."
Oh well, I guess we'll find out next year.
I had previously posted about the work on Burnet that was occurring along Broadmoor with the bike lanes and sidewalks. It seems like the work is limited to just the area in front of the Broadmoor development. Only the East side of Burnet, from Home2Suites to Gault Lane. Can anyone confirm this?
They have been putting in finishing dirt on the landscape, ready for grass. They did this for both sides of Burnet (seems like no work planned to fill the ditch on the West side of Burnet). They added space for a lane on the East side, but the new curb (road edge) angles in at the Home2 Suites for the road to not be expanded South from that point. Seems like this curb/sidewalk project was just for BroadMoor and the new office building, rather than the full Burnet corridor project.
The stuff in front of Broadmoor is being done as part of the development. The rest of the corridor is supposed to do the same as part of the corridor work from the (long delayed) 2016 mobility bond.
It is interesting, they basically put in a 2000 ft bike lane and added a lane to the roadway for the same distance. I guess it could be seen as doing the corridor project along their property now, so they are less impacted in the future (if) the corridor project ever is completed.
Los Angeles-based Kilroy halted construction of Stadium Tower, at 10615 Burnet Road, in October 2022 due to a struggling office sector and broader economic concerns, leaving a giant hole in the ground.
By the end of 2023, the paused project had cost the developer $70 million, up from $66 million through last June, the Austin Business Journal reported, citing Kilroy’s annual earnings report.
When the development came to a halt in 2022, Kilroy had spent nearly $55 million on the project. Since then, it’s cost the developer about $715,000 per month to keep the site as-is.
i say they should combine the property (or sell it to) the one next door (10501 burnet rd) and both projects should be re-imagined as a single, larger development that is more integrated.
yes yes yes
Don’t we all normally hate parcel accumulation because it kills the fine grained urbanism? That would likely take this from bad to even worse.