That small single story, set back building next door was apparently once a radio studio:
https://bayarearadio.org/sf-radio-history/kjbs-pine
https://bayarearadio.org/sf-radio-history/kjbs-pine
They are ugly though and remind me of a Holiday Inn Express off the freeway in Anywhere, USA
An interesting infill project proposed for the Bayview:
27 affordable units in two 6- and 7-story buildings in an area with predominantly 2-story single-family homes. Each building looks to be roughly the same footprint as a single-family home, but obviously much taller. This seems like an interesting model for densifying many of SF's low-density neighborhoods; I'll be interested to see if the project gets off the ground and is able to comply with all the relevant development standards.
Demolition Permits Filed For Affordable Teacher Housing In Mission District, San Francisco
![]()
BY: ANDREW NELSON 5:00 AM ON AUGUST 18, 2023
Demolition permits have been filed for the existing structure at 2205 Mission Street in San Francisco’s Mission District. The project will replace the existing damaged building with 63 affordable for-sale apartments for teacher workforce housing. The project developer, Mission Economic Development Agency, expects to start demolition this October, with completion by 2025.
The project was recently highlighted by J.K. Dineen for the San Francisco Chronicle after Mayor London Breed announced $32 million of funding for 2205 Mission Street and 750 Golden Gate Avenue by Hayes Valley. The funding will come from Proposition I. Both projects will provide housing for teachers within the SFUSD system. Most recently, the city was able to celebrate MidPen’s groundbreaking for the Shirley Chisholm Village Educator Housing in the Sunset District nearly one year ago.
...
Gelfand Partners Architects is responsible for the design. New renderings show the design has been simplified, with white and grey stucco contrasted with blue window shades. A mural will be included along 18th Street and above the Mission Street entrance.
The 0.22-acre parcel is located at the corner of Mission Street and 18th Street in the heart of the busy neighborhood. The 16th Street BART Station is just two blocks away. New building permits were filed in January 2021, and the project received final approvals in September of the same year. According to the project application, construction is expected to last 17 months for an estimated $43.5 million. That projected cost is not inclusive of all development expenses.
Demolition Permits Filed For 2051 Market Street, San Francisco
![]()
BY: ANDREW NELSON 5:30 AM ON AUGUST 20, 2023
Demolition permits have been filed for the existing two-story structure at 2051 Market Street in San Francisco’s Mission Dolores neighborhood. The site was home to the Eros bathhouse for 30 years before closing last year and has since hosted the Third Space art gallery and event space. Sak Design & Build is the project client.
Winder Gibson Architects is responsible for the design. New illustrations show that the post and lintel veneer has changed from a champagne-tone to red wood-look panels. The other facade materials will include stucco and fiber cement.
The 85-foot tall structure will yield 29,320 square feet, with 27,480 square feet for housing and 1,810 square feet for ground-level retail. Of the 24 units, there will be six one-bedrooms, 12 two-bedrooms, and six three-bedrooms. Parking will be included for 24 bicycles and no cars. Three units will be designated as affordable housing, allowing the proposal to use the State Density Bonus program.
The 0.11-acre parcel is in a triangular lot bound by Market Street, 14th Street, and Dolores Street. Future residents will be close to the underground light rail station, Safeway, and Duboce Park.
Salvation Army Proposed Housing For 850 Harrison Street In SoMa, San Francisco
![]()
BY: ANDREW NELSON 5:30 AM ON AUGUST 21, 2023
Preliminary plans have been submitted for an eight-story transitional housing block at 850 Harrison Street in SoMa, San Francisco. The mid-rise proposal has been submitted by the Salvation Army to support its extended recovery and transitional housing program. Equity Community Builders is the project developer.
The suites will be part of the Salvation Army’s “The Way Out” program, self-described as a “recovery-focused homeless initiative” supporting residents toward independent living. A pilot program for TWO has started at the Joseph McFee Center, with plans to expand the 36-participate facility to 96 individuals later.
The 84-foot tall proposal is expected to yield around 91,400 square feet, with 65,400 square feet for housing and 26,000 square feet of community space. Parking will be included for 30 bicycles and three cars. For housing, there will be 22 five-room suites, with two two-bedroom guest suites on levels six and seven in the west wing. Each of the suites will have two beds per room, resulting in a total capacity of 224 beds.
So far, only preliminary elevations have been shared. The illustrations, drafted by Leddy Maytum Stacy Architects, show a defined post-and-lintel gridded exterior with a two-story cantilever feature sheltering the ground-level entrance. Facade materials have yet to be provided. Solar panels will be installed on the roof.
The U-shaped floor plan is divided into three sections, the North Wing, South Wing, and West Wing. The pedestrian entrance is located on the south wing, connected to a double-height lobby and looking toward the two-tiered courtyard. The rest of the first floor includes a multipurpose room, a residential services office, bicycle parking, and a large communal event space, which includes a kitchen, classrooms, and offices. The top floor will include a workout fitness center and amenity roof deck.
The 0.37-acre parcel extends from Harrison to Clara Street between 4th and 5th Street. Future residents will be close to the Yerba Buena Moscone subway station, connecting riders between Chinatown and the San Francisco Caltrain Station.
While some stores are leaving San Francisco, Ikea is opening there this week
By CNN COM WIRE SERVICE
PUBLISHED: August 21, 2023 at 10:45 a.m.
By Nathaniel Meyersohn | CNN
New York — Ikea is opening a new store in downtown San Francisco Wednesday, bucking the trend of retailers closing in the city.
Ikea will be the anchor tenant for a new mixed-use development on Market Street with retail, offices, restaurants and entertainment.
City leaders are hopeful that the home furniture store will draw shoppers to downtown San Francisco and support other businesses in the area at a time of store closures and rising public safety concerns.
Ikea’s parent company purchased the six-floor glass building in 2020 for redevelopment, at a cost of $260 million. The acquisition was part of Ikea’s strategy to open smaller stores in downtown districts after years of building sprawling locations on the outskirts of cities and in the suburbs.
Ikea will be the first retailer to open in the new development. Its three-level, 52,000-square-foot store will showcase 27 different room options for apartments and smaller city homes for customers. Shoppers will be able to buy and take home smaller products, but bigger furniture items like couches and bookshelves will only be available to order for delivery.
“The arrival of @IKEA is great news for the City’s economic recovery that will bring local jobs and excitement to the Union Square area,” San Francisco Mayor London Breed said earlier this month. “We are thrilled to welcome IKEA to be part of San Francisco’s future.”
Meanwhile the nearly complete property at the end of Kansas (4 duplexes and 1 townhome) is facing potential demolition due to fire hydrant issues (city claims it needs 1000gpm whereas nearby ones are at 350) or pour $2-3mm more into infrastructure upgrades. Unreal.
https://archive.li/ra51s
Meanwhile the nearly complete property at the end of Kansas (4 duplexes and 1 townhome) is facing potential demolition due to fire hydrant issues (city claims it needs 1000gpm whereas nearby ones are at 350) or pour $2-3mm more into infrastructure upgrades. Unreal.
https://archive.li/ra51s
Oh my… I live on this block and have been wondering why this project has taken so long. This is a terrible outcome, and the developer is going to lose his entire business over it? Damn… I hope agreement can be makes, or some firm picks it up and makes it whole instead of just tearing the whole thing down or turning it into a desolate, abandoned lot…
"Now we have five buildings that are half under construction and we are $20 million into building. I said, 'if you're telling us we can't do it, then we can't finish the project. What should we do?' And he's like, 'well, demolish them,'" Eastwood added. "Obviously, that answer doesn't work for us."
...
The developer alleges that the city has shot down solutions he's proposed and held his team to unfair standards, ultimately requiring him to commit up to a complex and costly infrastructure project that would ensure compliance. Even with his agreement, Eastwood said that it has failed to issue permits for the infrastructure work. Without it, the alternative may be to tear down the new homes.
It does say as much in the archived article link
"These are some early conceptual renderings by Gensler as part of its feasibility study solely for testing purposes," a Gensler spokesperson said Wednesday.
"We want to give people an understanding of what could happen and get a developer and others excited about making investments into the stadium as a way to diversify what happens in the Downtown area," Breed said.