Um, what?
In what way are things focussed on the downtown core?
He's delusional.
Um, what?
In what way are things focussed on the downtown core?
As everyone has said, the LRT is commuter rail so it is not built for the core. The west side of the city at least gets the LRT hitting some of its neighbourhoods but the east stretch ignores all residential areas and follows the highway.
So far the city has done effectively nothing to serve the inner eastern core at all. Do they even have any future plans? West side has Baseline and Carling brts in the plans as well but in the east what is there other than more suburban routes like the Renaud brt?
As everyone has said, the LRT is commuter rail so it is not built for the core. The west side of the city at least gets the LRT hitting some of its neighbourhoods but the east stretch ignores all residential areas and follows the highway.
So far the city has done effectively nothing to serve the inner eastern core at all. Do they even have any future plans? West side has Baseline and Carling brts in the plans as well but in the east what is there other than more suburban routes like the Renaud brt?
There is a train joke here somewhere..
The Alstom Citadis trains on Ottawa’s LRT were designed for European tracks where restraining rails like the ones to prevent derailments on the tight curves of the Confederation Line are not used, OC Transpo’s general manager Renée Amilcar told councillors Wednesday.
That's a devastating indictment of the competency of RTG if that is truly the case. Sounds very much like a 'left hand doesn't know what the right is doing' situation.
CBC News just mentioned that the Confed Line opened in 2019 with the trains not touching the guard rails. How do we prevent a shift of the rails in the future with our climate? Frost heaving is part of our climate. Scheduled shut downs of the system to adjust the rails?
I think this looks pretty bad on Alstom too. They’ve been marketing and selling these trains as their North America specific model, but they didn’t even design and build them to work with the track design that exists everywhere across North America?
Metrolinx has purchased 61 of these lemons and Alstom’s already been building them for 3 years. Quebec City has purchased 34. Presumably they both also need to wait for the new axle design to be able to operate these at normal speeds and with normal maintenance timelines.
100 kph is 20 kph above standard S-Bahn speed. Even tram-trains, the seimens product goes to 70 kph, the RegioCitadis is 80 kph, the "ET 2010" flexity swift is 80 kph, and the Flexity Link is 90 kph.
Frankly the operating spec was asking for a lot of of any vehicle and committed Ottawa to a brand new product no matter the manufacturer.
I think this looks pretty bad on Alstom too. They’ve been marketing and selling these trains as their North America specific model, but they didn’t even design and build them to work with the track design that exists everywhere across North America?
Metrolinx has purchased 61 of these lemons and Alstom’s already been building them for 3 years. Quebec City has purchased 34. Presumably they both also need to wait for the new axle design to be able to operate these at normal speeds and with normal maintenance timelines.
There is a lot of Alstom bashing going on here. They sell trains. The responsibility falls on OC Transpo to make sure the trains they are buying work with the trail they are building. It's a total embarrassment for the City. This "We are just the guinea pig" attitude does not fly - someone didn't do their job - or worse - didn't know this was a job that had to be done or checked - which boggles my mind.
There is a lot of Alstom bashing going on here. They sell trains. The responsibility falls on OC Transpo to make sure the trains they are buying work with the trail they are building. It's a total embarrassment for the City. This "We are just the guinea pig" attitude does not fly - someone didn't do their job - or worse - didn't know this was a job that had to be done or checked - which boggles my mind.