HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 22, 2023, 2:12 PM
SidetrackedSue SidetrackedSue is offline
Registered User
 
Join Date: Jun 2019
Posts: 398
Quote:
Originally Posted by zzptichka View Post
Connecting these plants on the Hill and at Tunney's is a lot of work.
Still not sure what's the point doing it...
Won't it supply greener, centralized heating to whatever replaces the feds at Tunney's?

Other cities are starting to do similar systems not just as government project. For instance, in Halifax the new Queen's Marque has additional capacity so other buildings can tap into it.

https://www.cbc.ca/news/canada/nova-scot...awater-harbour-heating-cooling-1.4869012
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 4:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.