HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 30, 2015, 11:34 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by officedweller View Post
You mean double interlining the M-Line to retain the existing route (called the "Double Coordinated" option)?
The timing is too complex and a delay on one line will screw up all 3 routes (although Expo Line trains going to Production Way also requires some double interlining too).
It may also have to do with the ridership on each line and getting Expo Line trains back to the Expo Line faster (instead of going all the way to VCC Clark since Millennium Line ridership is lower than Expo Line).

See discussion here:
http://forum.skyscraperpage.com/showpost.php?p=6707940&postcount=5909
Yeah, the plan of turning back at Production Way incurs all those timing issues because they're still functionally interlining for a single station. It's all the downsides with none of the upsides (of continuous routing to VCC-Clark).
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.