HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #22  
Old Posted Sep 27, 2009, 1:38 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,679
Also, let's put it in perspective. The costs for the tunnel peg it at about triple of what is being spent on Baseline station at the moment. There's a lot more fat to be trimmed elsewhere and stupid short term transitway expenditures should be cut first.

I'd love to see a ward by ward pie chart of where the city's tax revenues (commercial and residential) come from, and I'm sure the core wards (Sommerset and Rideau-Vanier) probably pull in more than their fair share. Contrast that with transit infrastructure expenditure, they'd probably be in the low end of the scale.

The tunnel will be a 100+ year investment, and the sooner it is built, the sooner it gets amortized in today's cheaper dollars in hindsight. Enough talk, consultation and discussion has gone on in the last few years, and anyone who is sour because "their idea" was not considered is just confusing the issue.

I find it disturbing that the tunnel is becoming a filibustering point. Its only downside is the cost, which when factored beyond transit issues (yes, aesthetics, noise and surface pedestrian/cycling environment are worthy factors) make it worth every penny even at twice the projected cost in my opinion.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy
Forum Jump



Forum Jump


All times are GMT. The time now is 7:56 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.