HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 19, 2024, 7:42 PM
BlackDog204's Avatar
BlackDog204 BlackDog204 is offline
Registered User
 
Join Date: Oct 2020
Location: west
Posts: 1,806
Quote:
Originally Posted by EdwardTH View Post
At the end of the day, you couldn't do much on Pembina anyway other than a glorified bus lane, which if I understand correctly is essentially part of the master plan anyway. Putting a grade-separated line on Pembina would cost billions and would simply never happen. With the dog leg we get an actual separated line which is (slowly) creating TOD, and we'll still get the souped-up bus lane on Pembina too.
You are correct. Putting a grade separated line on Pembina Hwy would ahve cost too much. That is why some civil engineers and city planners were pushing for the line to be located along the rail line ROW directly parallel to Pembina.

I have no idea having a grade separated line on Pembina was even considered.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:55 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.