Quote:
Originally Posted by dave8721 View Post
It should be pointed out though that the company builds docks and seawalls. A good indicator that they are probably just working on the docks and or seawalls rather than actual construction of the tower though it is something.
I'd imagine that would be part of phase 1. Later, it will rise once the docks, and water work is finished up. Better to get the foundation and hard to install utilities set up first. Would complicate the tower portion later on if its not resolved first.

The Watson Island Development, a 2 tower project, is doing something similar. Starting with the marina and then, the two towers.