Posted Apr 13, 2012, 1:45 AM
|
|
gettin' rich!
|
|
Join Date: Aug 2002
Location: Toronto
Posts: 34,170
|
|
The first element is creating an 8 storey commercial podium beginning at Mayfair Mews that extends along Bloor Street West
Renfrew store but adds four more storeys plus a rooftop garden on top of the flagship luxury department store. The 8 storey podium will be made up of retail space and offices.
The second element is building a 72 storey residential condominium tower plus 3 building service levels that sits on top of the 8 retail podium but does not extend over Holt
the
as
Renfrew
becomes part of the amenities for the condominium building. The condominium tower will be made up of approximately 600
Levels 11-38 will be the Garden Terrace Suites, followed by the City View Suites on floors 41-65 and topped off with the Sky-garden Penthouses on floors 68-80.
new address for the condominium building will be 30 Bloor Street West.
There are also plans for 6 level underground parking garage under the condominium tower at 30 Bloor Street West consisting of approximately 620 parking spaces for the condominium residents and commercial tenants.
30 Bloor Street West Amenities
Twenty four hour concierge Valet parking
Garden Terrace Levels 9 & 10 features:
Indoor lap pool and lounge Wellness spa Fitness centre with double height climbing wall Children's playroom Dining room with catering kitchen Party room Games room
Outdoor Rooftop Terrace features
Outdoor pool & sundeck Outdoor lounge with fireplace Outdoor dining area with barbeque Outdoor running track Roller blade oval Ice-skating rink Tennis court Outdoor children's and games area
City View Levels 39-40 features:
Landscaped terrace at level 39 Social rooms for condo residents Library Media lounge with music studio
Skygarden Levels 66 & 67 features
Landscaped terrace Sky lounge
|