View Single Post
  #47  
Old Posted Dec 13, 2009, 4:42 AM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by Bedford_DJ View Post
^Just a correction for yah;

Exit 32 is Church Street (stands to be bypassed)

Exit 33 is Beech Hill Road (new interchange being built)
Thanks, I was going by a combination of maps, other sites and Google Earth, since I haven't travelled that highway since 2000.

Twinning/bypassing the Canso Causeway would be an interesting decision, since the options are:

1) Twinning the causeway, new approaches (but how to cross the railway?)

2) Twinning the causeway and the approaches (requires major expropriation, and curves are too much)

3) New 4 lane causeway to the north (IMO the best option)

4) New 4 lane high-level bridge to the north (most expensive option for sure)
Reply With Quote