View Single Post
  #70  
Old Posted Aug 15, 2012, 6:43 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Quote:
Originally Posted by go_leafs_go02 View Post
The MOT is widening about 3.5km of Highway 3 approximately 15-20 km south of Princeton towards Manning Park.

http://www.th.gov.bc.ca/BCHighways/c...23159-0002.htm

Quite surprised by this, as I thought the Ministry had no plans to ever upgrade Highway 3 minus some safety improvements in a few of the tight corners and stuff.
That section looks like it's just west of the Princeton copper mine and isn't that expensive to upgrade to a 100 km/hr design standard.

The winding Whipsaw Creek section, further west of there, has been identified for major upgrades since as early as 1988. Again, last year, mayors representing 23 communities along Hwy 3 identified their highest priority to be a Hwy 3 realignment from Sunday Summit to Whipsaw Creek.

That section is highly substandard late 1940's engineering. And I've been stuck crawling behind a slow-moving tractor trailer there too oft to mention. To bring that up to a 100 km/hr design speed would require big, big bucks and numerous bridges as well as massive earthworks.

With so many other expensive priorities, I can't see that happening for a long, long time.
Reply With Quote