View Single Post
  #83  
Old Posted Jul 16, 2019, 4:43 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,481
Quote:
Originally Posted by Philly Fan View Post
Probably not. That first load is probably the beams and joists for the first floor deck, which may take a bit of time to install. They have to build that first floor deck before starting the walls.
On second thought, it looks like they ARE starting to erect the wall columns. On the webcam, you can see the tall white pieces being erected along what will be the Walnut Street facade.