View Single Post
  #60  
Old Posted Sep 29, 2023, 2:02 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
Excavation Progresses At 380 4th Avenue In Gowanus, Brooklyn



Quote:
Excavation is continuing at 380 4th Avenue, the site of a 17-story residential building in Gowanus, Brooklyn. Designed by GF55 Architects and developed by Quinlan Development Group LLC, the 175-foot-tall structure will span 211,650 square feet and yield 197 rental units with an average scope of 830 square feet, as well as 6,030 square feet of ground-floor commercial space, a cellar level, a 40-foot-long rear yard, and 30 enclosed parking spaces. Fifty of the units will be designated as affordable housing. McGowan Builders Inc. is the general contractor for the $78 million project, which is located between 3rd and 6th Streets.

Recent photographs show several excavators digging further below street level at the site, which was formerly occupied by a one-story taxi depot. A piling machine is also present, carrying out preliminary work for the foundations. Wooden retaining walls have been assembled around the perimeter of the plot as crews descend.

Renderings show 380 4th Avenue rising with a rectangular massing and a façade composed of modular brick walls, bronze-colored metal and EIFS panels, and floor-to-ceiling windows. The first two levels feature wide brick-clad arched openings with bronze-colored spandrels and mullions for the retail frontage and main entrance. Setbacks on the 12th and 15th floors will make way for outdoor terraces, and two small stacks of balconies are located on the upper half of the slender southwestern and northeastern elevations.
===================
NYY
Reply With Quote