Culwulla's diagram
quick view
poster
Edited by malec:
I have included a few new goodies this time.
How to read my tables.
The general progress of the towers and stats, etc.
How the construction is expected to progress on these towers. For this I didn't use official schedules, just did them based on my own intuition and observation of construction of these type of towers in general. They could be wrong so nobody should take these as set in stone at all. Also this is assuming things go as they are currently going now and no major surprises, good or bad.
You'll notice I've given timetables for damac heights and the lighthouse tower which are now on hold. Work on damac heights is supposed to start soon enough and also there is a chance more work will be done on the lighthouse. I've made the timetable assuming they do get started and then a main contractor. Same with burj al alam and the pentominium.
The projected number of supertalls as the years go by.
Dubai Supertall Progress Report
Nakheel Tower
As dead as a door nail.
Burj Dubai
Cladding work has increased in speed recently
Pentominium
Piling is finished and excavation is going on to reveal the pile caps. The main contractor is ACC who have a lot of experience building supertalls. They have built or are building the princess tower, elite residence, almas tower, rose rotana, etihad towers and central market in Abu Dhabi.
One Park Avenue
Dead.
Dubai Towers
Dead
Burj al Alam
Piling work has been restarted here and is going on at a fairly quick pace. Piling is supposed to be completed at the start of the next year.
Burj al Fattan
The height has been revealed as 463m from a document from somebody working on the design. The demolition is pretty much done now. We will see soon whether this area becomes a construction site or a car park!
Bin Manana Twin Towers
Piling continues but slowly.
Damac Heights
Nothing here but there is a redesign expected and apparently Damac still want to build this in some shape or form.
Marina 106
This has gotten very slow recently. Almost on hold I think but we will see.
Princess Tower
This has definitely slowed down. The tower rises only one floor every two weeks now. Core is on the 66th floor.
Marina 101
Once the regular floors started this started rising quickly. The tower is now on the 26th floor.
The Lighthouse
Piling has been completed but this is now on hold since there has been no main contractor selected.
23 Marina
Progress is steady, not slow and not fast. They have started work on the last section of floors which is a set of 24 floors which will have balconies with pools on them. Will be interesting to see how they look. I expect progress to slow down a little because of every second floor being different. Should reach 300m in the new year I think.
Emirates Park Towers
Excellent progress here. Somewhere above the 60th floor now and should pass 300m before the end of the year.
Elite Residence
This is also very slow. They have been building the 2nd and 3rd floors above the podium for ages and are only now starting to get past.
Almas Tower
Still not completed but is actually partially occupied already.
Al Attar Tower
Progress continues on the cladding but very slow. Nothing yet on the spire.
The Torch
Progress continues to be very good here. The tower is on the 75th floor while the core is at the 77th or 78th floor. This should reach 300m in a few weeks.
Rose Rotana Suites
A completed but unused tower on SZR.
The Skyscraper
Very very slow, almost dead.
Al Yacoub Tower
Work here has picked up speed once again after going on hold for a while. The height has increased by a few floors and lots of cladding (but ugly) has been put on. The tower seems to be somewhere near the 65th floor while the core is around 2 or 3 levels above.
The Index
Very slow still but there is progress at least. Cladding at the tower is continuing at a slow pace.
HHHR Tower
Cladding work is progressing well and this tower should be complete early next year.
Ocean Heights
Excellent work here and looking great too. Tower on the 68th floor and core probably on the 70th. Should top out before the year’s end.
Infinity Tower
Work is progressing well here. The tower is on the 14th floor while the core is somewhere near the 20th.
Al Hekma Tower
Dead