Quote:
Originally Posted by Urbanthusiat
Ah the ol' Philly tradition of saying something is structurally wrong with a major building. Remember when the Comcast Tower was off plumb?
|
That was actually a thing, why do you think the first section of cooling towers cracked? It was supposed to top out in August 2017 but it was delayed and topped on November 27