View Single Post
  #81  
Old Posted Jul 15, 2019, 9:14 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,482
Quote:
Originally Posted by City Wide View Post
As I was driving by today the first load of steel beams was being dropped off. I'm guessing by the end of the week the frame might well be above ground level.
Probably not. That first load is probably the beams and joists for the first floor deck, which may take a bit of time to install. They have to build that first floor deck before starting the walls.