Quote:
Originally Posted by MalcolmTucker View Post
No, the project can not operate using existing track - it involves twinning and selective tripling of the track between Calgary and Banff. This is the CPR mainline to the coast, and is effectively at capacity with freight. It cannot accommodate a useful service without major track works.
Yip. If all that costs $600M, or double that even, I'll eat my hat.

Was there a timeframe given for that CIB study? Until that's out, this topic of conversation won't have much to talk about.