Posted Jul 28, 2023, 2:26 PM
|
Registered User
|
|
Join Date: Aug 2011
Posts: 1,657
|
|
The MTO is set to rehabilitate the CNR overhead just south of the 522 junction later this summer. The contractor has already set out some of the signage for the work zone this summer. I'm sure the Ministry would have preferred to have started the twinning work instead, because the CNR bridge that is about to be rehabilitated is set to be replaced once the highway twinning project commences.
|