Quote:
Originally Posted by Jayfar View Post
There most definitely is a Commercial Building permit, applied for last year, but issued yesterday, according to eclipse (but which doesn't show in atlas for that same address). I have no idea what's up with the ongoing inconsistencies between atlas and the newer eclipse system.

Commercial Building Permit CP-2020-005959 (Issued)
Status: Issued
Application Date: Oct 27, 2020
Issue Date: Sep 9, 2021
Completed Date:
Expiration Date: Mar 9, 2022


Type of Work: New Construction

Approved Scope of Work: FOR THE ERECTION OF AN ATTACHED SIX STORY STRUCTURE WITH A ROOF DECK ACCESSED BY A PILOTHOUSE. STRUCTURE FOR USE A VACANT COMMERCIAL SPACE( SEPARATE USE PERMIT AND FITOUT TO BE OBTAINED PRIOR TO OCCUPANCY) AT FIRST FLOOR, FOR A MULTI-FAMILY HOUSEHOLD LIVING ( FOURTY-EIGHT(48) DWELLING UNITS FROM SECOND FLOOR THROUGH 6TH FLOORS WITH ACCESSORY THIRTY-SIX(36)PARKING SPACES IN THE BASEMENT LEVEL, AND TWENTY(20) BICYCLE SPACES IN AN ACCESSIBLE ROUTE. BUILDING COMPOSED OF TWO DIFFERENT CONSTRUCTION TYPES (TYPE IA(BASEMENT-FIRST FLOOR LEVEL) AND TYPE IIIB CONSTRUCTION (THIRD-SIXTH FLOOR LEVEL). BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN THE EXIT STAIRWAYS PER NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 15 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK. *** FIRE WATCH IS REQUIRED ONCE COMBUSTIBLE CONSTRUCTION IS OVER 40 FEET IN HEIGHT, A SITE SAFETY PLAN SHALL BE SUBMITED TO BUILDING INSPECTOR PRIOR TO THE START OF ANY CONSTRUCTION.*** SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.


Type of Structure: Apartment

https://eclipse.phila.gov/phillylmsp...ctId=283590244
There is still a narrow empty lot and a vacant 1 story commercial building on the lots north of this one. My guess is that perhaps this permit is for that project (which was presented at some point).