Quote:
Originally Posted by 1overcosc
Is the Pie-IX corridor still supposed to be BRT (or SRB, as it's called in Quebec)? I thought I heard they were thinking about switching to LRT.
|
It's supposed to be BRT but it should be switched to LRT, IMO. The ridership potential on that line is huge. They should also at least do a one station extension of the Blue line so the BRT/LRT can connect effectively with the Metro system.