Quote:
Originally Posted by dmuzika
Might be a bit tricky in Phase 4. The Park Bridge was an outright realignment (the highway rejoins the old alignment at the rest stop). Phase 4 is mostly be an expansion of the existing alignment with some new bridges and rock cuts; no major realignments. I think there will still be construction work, but outright closures are only permitted spring/fall.
|
Depending on the blasting work that is required, I think there will be minimal closures as well. With the original tunneled approach there would have been more closures.