View Single Post
  #83  
Old Posted Feb 9, 2021, 4:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,024
Additional funding has been earmarked for the joint Ottawa Public Library - Library and Archives Canada facility at LeBreton Flats to make it a net-zero facility.

The new funding will allow for:
  • upgrades to the building’s envelope and insulation;
  • triple-glazed windows;
  • solar panels on the rooftop and embedded in the facade;
  • additional sustainable materials; and
  • an indoor green wall.

The new central library is set to open in late 2024-2025.


Green roof with solar panels

https://www.canada.ca/en/library-arc...er-future.html
Reply With Quote