Posted Feb 18, 2016, 9:31 PM
|
|
Moderator
|
|
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,380
|
|
According to an inside source over on HAIF, the building will come down sometime this year, floor-by-floor. Bid is currently down to two demo contractors.
|