Quote:
Originally Posted by Jim Dandy
Very well. Why did the Brackenridge owners need a "stay" on the proposed CVC's? Did they feel they would not have a site plan submitted prior to the enactment of that CVC that runs directly through the middle of their parcel?
|
I suspect that was the reason. The build out of the Brackenridge site will probably take place over several years (a decade maybe?) and multiple site plans would probably be filed for different buildings rather than a single one for the entire project.