View Single Post
  #96  
Old Posted Jan 29, 2018, 5:58 PM
ebuilder ebuilder is offline
BANNED
 
Join Date: Dec 2017
Posts: 120
Quote:
Originally Posted by ConstructStudent View Post
This is a new structural system where some of the partitions are load bearing and include structural studs. Not all of the partitions will be prefabricated.
Can you explain the advantages? My guess is that this means less time needed to construct because you aren't erecting steel and then fireproofing and covering all that steel with partitions as you fit out the steel shell. I assume these prefab panels already have required hour rating per code so you save all the time and money associated with spray on protection operations.