View Single Post
  #68  
Old Posted Mar 28, 2006, 5:54 PM
Research1 Research1 is offline
Registered User
 
Join Date: Feb 2006
Location: Seattle, WA
Posts: 8
Quote:
Originally Posted by horatio_the_hermit
The topped-out One Lincoln Tower Looks terrific with glass installed up to floor 40. Ashwood commons is looking decent with glass and its Vancouver facade installed up to floor 10 and concrete up to 18.

I will have new pics by the end of the week.

Some questions.

1. Has the Eddie Bauer Tower construction resumed yet.
2. Has the Technology Tower construction resumed yet.
3. Has construction on the second Ashwood commons started yet.
4. Who is the developer for the Euro tower.
The developer of the Europen Tower is GIS International.

http://www.europeantower.com/
Reply With Quote