The rest of the repsonse:

"The PTH 59/101 Interchange project is still a priority, but it is a very complex project that requires significant engineering – to ensure that we built a facility that can meet the traffic needs for the next 50 years or so.

The PTH 59/101 Interchange was delayed to allow for an area transportation study to be undertaken, as the public Open House response indicated there were concerns with the proposed design and the impacts on adjacent access points on PTH 59. Therefore, we believed it was vital to try and address the concerns.

We are currently in the process of reviewing design options and plan to hold an Open House shortly afterwards. Once we have the interchange concept finalized, we will finalize the detailed design, which then will allow the project to move to the construction phase."


So. If everything were to go as outlined in this e-mail, potential for site works to start next year. But I'd say we're at least two years off. Maybe.

Also sounds like it may get rolled out in phases. AT overpass, actual interchange. Then the interchange at PR 202. Then maybe the Garven interchange.