View Single Post
  #2877  
Old Posted Oct 29, 2020, 10:04 PM
Siriusb's Avatar
Siriusb Siriusb is offline
Registered User
 
Join Date: Mar 2019
Location: Charlottetown
Posts: 1,135
15 Haviland St Project Site Prep Begins

Traffic Advisory: Boardwalk Closure

Posted on 10/29/2020

A section of the boardwalk that runs along the waterfront parallel to Haviland Street, adjacent to the Culinary Institute and the Armoury, will be closed to pedestrians during construction of a project at 15 Haviland Street. Those using the boardwalk will need to go around the site while exploratory excavation work related to a future building and the existing stormwater pipe is completed.

I see the trees are being removed.

NOTE: The permits from the Province and City are in place. The boardwalk will be reinstated.

Also, a special meeting took place with the developer and the residents of Renaissance Place, providing them with
winter parking on the developers property during site prep.


Last edited by Siriusb; Oct 29, 2020 at 10:36 PM.
Reply With Quote