Quote:
Originally Posted by JayPro
If a five year wait translates to how long it must take before everyone gets on board with this rezoning plan, then so be it.
|
The rezoning will be put in place by the summer. The City is requiring the 5 year period before anything can be
built to give the Hudson Yards district the jump start. But already this stands out as one of the more high profile of the Midtown "proper" office buildings.
Quote:
Originally Posted by reencharles
I'm a little disappointed. I was expecting something EPIC for this project, by what they were talking about.
|
I don't know exactly what you were expecting, but this is still a concept of what they are planning. It's not the final design, but an idea. They are moving fast with the planning, but those sketches are just that.